Analysis of 3 kW Solar Power Plant Production Optimization by Improving Energy Production Efficiency Using 3d Pvsyst Simulation Method

This study aims to analyze the effect of optimizing the position of solar panels on improving energy production efficiency in a 3 kW solar power plant (PLTS) system. The 3D PVsyst simulation method was used to model the system and predict performance before and after optimization. Simulation results indicate that repositioning the solar panels can increase energy production by 2% (from 0.99 kWh to 1.01 kWh). A comparison between simulation results and actual data shows reasonably good agreement, although some differences require further investigation. Discrepancies between simulation and actual data may be attributed to several factors, such as weather conditions, component efficiency, and other environmental factors. This study concludes that optimizing the position of solar panels is an effective step to enhance the performance of PLTS systems. However, further research is needed to consider additional factors affecting system performance and to develop more accurate simulation models

Authors

Publication Details

Journal
ELKHA
Published
2025-04-21
DOI
https://doi.org/10.26418/elkha.v17i1.89864
Primary Topic
Solar Radiation and Photovoltaics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of 3 kW Solar Power Plant Production Optimization by Improving Energy Production Efficiency Using 3d Pvsyst Simulation Method

Rusman Rusman, Hasan Hasan, Rudi Kurnianto, Redi Ratiandi Yacoub et al.
1 links
ELKHA
Solar Radiation and Photovoltaics
article

Analysis of 3 kW Solar Power Plant Production Optimization by Improving Energy Production Efficiency Using 3d Pvsyst Simulation Method

Rusman Rusman, Hasan Hasan, Rudi Kurnianto, Redi Ratiandi Yacoub, Teguh Mohammad Fiqri
article en

Abstract

This study aims to analyze the effect of optimizing the position of solar panels on improving energy production efficiency in a 3 kW solar power plant (PLTS) system. The 3D PVsyst simulation method was used to model the system and predict performance before and after optimization. Simulation results indicate that repositioning the solar panels can increase energy production by 2% (from 0.99 kWh to 1.01 kWh). A comparison between simulation results and actual data shows reasonably good agreement, although some differences require further investigation. Discrepancies between simulation and actual data may be attributed to several factors, such as weather conditions, component efficiency, and other environmental factors. This study concludes that optimizing the position of solar panels is an effective step to enhance the performance of PLTS systems. However, further research is needed to consider additional factors affecting system performance and to develop more accurate simulation models

ELKHAVol. 17(1)
Openalex Percentile: Top 96%
Solar Radiation and Photovoltaics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of 3 kW Solar Power Plant Production Optimization by Improving Energy Production Efficiency Using 3d Pvsyst Simulation Method — Rusman Rusman, Hasan Hasan, et al. · ELKHA (2025) | TGRS Research Map | TGRS