Application of Vertical Flow Constructed Wetland for Organic Pollutant Removal from Petroleum Refinery Wastewater

This study examined the application of a pilot-scale Vertical Flow Constructed Wetland (VFCW) system for secondary oil refinery effluent treatment at PPSDM MIGAS, Indonesia. The VFCW technique, known for its simplicity, minimal operational cost, and environmental friendliness, was used to reduce organic pollutants (BOD and COD) to meet the standards and minimize pollutant levels. The system, constructed with a closed pond including gravel and sand substrates, and planted with Typha angustifolia, was evaluated under Hydraulic Retention Times (HRT) of 3, 4, and 5 days. The results showed BOD removal efficiencies of 52.9%, 54.4%, and 53.6%, and COD removal efficiencies of 35.7%, 49.1%, and 47.2% for hydraulic retention times of 3, 4, and 5 days, respectively. Statistical investigation (ANOVA) showed no significant difference (P > 0.05) in BOD removal efficiencies across HRTs and COD removal for 4 and 5 days. These findings implied diminishing benefits after 4 days for organic matter removal operations. The limited BOD and COD removal, in contrast to other investigations, was due to the short acclimatization time (7 days) for the Typha angustifolia to drive oxygen sufficiency and biofilm formation. These findings underlined the capability of the VFCW system to reduce wastewater contaminants sustainably and economically in tropical areas such as Indonesia. A 4-day HRT is recommended for practical applications in refinery wastewater treatment with pollutant loads up to complement. Extended acclimatization duration and improved operational settings are recommended to enhance the performance of the VFCW. This study illustrates the feasibility of VFCW as a scalable and environmentally sustainable solution for wastewater control in the petroleum industry sector. Keywords: VFCW, organic pollutants, retention time, removal efficiency, acclimatization.

Authors

Institutions

Publication Details

Journal
REAKTOR
Published
2025-03-26
DOI
https://doi.org/10.14710/reaktor.24.2.68-75
Citations
1
Primary Topic
Constructed Wetlands for Wastewater Treatment
Type
article
Field-Weighted Citation Impact
1.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of Vertical Flow Constructed Wetland for Organic Pollutant Removal from Petroleum Refinery Wastewater

I Nyoman Widiasa, Amelia Lestari
1 citations
REAKTOR
Constructed Wetlands for Wastewater Treatment
1.00
article

Application of Vertical Flow Constructed Wetland for Organic Pollutant Removal from Petroleum Refinery Wastewater

I Nyoman Widiasa, Amelia Lestari
article en
1 citations

Abstract

This study examined the application of a pilot-scale Vertical Flow Constructed Wetland (VFCW) system for secondary oil refinery effluent treatment at PPSDM MIGAS, Indonesia. The VFCW technique, known for its simplicity, minimal operational cost, and environmental friendliness, was used to reduce organic pollutants (BOD and COD) to meet the standards and minimize pollutant levels. The system, constructed with a closed pond including gravel and sand substrates, and planted with Typha angustifolia, was evaluated under Hydraulic Retention Times (HRT) of 3, 4, and 5 days. The results showed BOD removal efficiencies of 52.9%, 54.4%, and 53.6%, and COD removal efficiencies of 35.7%, 49.1%, and 47.2% for hydraulic retention times of 3, 4, and 5 days, respectively. Statistical investigation (ANOVA) showed no significant difference (P > 0.05) in BOD removal efficiencies across HRTs and COD removal for 4 and 5 days. These findings implied diminishing benefits after 4 days for organic matter removal operations. The limited BOD and COD removal, in contrast to other investigations, was due to the short acclimatization time (7 days) for the Typha angustifolia to drive oxygen sufficiency and biofilm formation. These findings underlined the capability of the VFCW system to reduce wastewater contaminants sustainably and economically in tropical areas such as Indonesia. A 4-day HRT is recommended for practical applications in refinery wastewater treatment with pollutant loads up to complement. Extended acclimatization duration and improved operational settings are recommended to enhance the performance of the VFCW. This study illustrates the feasibility of VFCW as a scalable and environmentally sustainable solution for wastewater control in the petroleum industry sector. Keywords: VFCW, organic pollutants, retention time, removal efficiency, acclimatization.

REAKTORVol. 24(2)
Diponegoro University (ID)
Universitas Diponegoro
Openalex Percentile: Top 24%
Constructed Wetlands for Wastewater Treatment
1.00
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.