Understanding Running Behavior to Improve 4.5" Lower Completion in ERD Well Injector

Abstract The deployment of single trip 4.5″ lower completion in longer lateral and extended reach well to accommodate requirement of maximum reservoir contact (MRC) campaign especially in mature field with huge number of well drilled becomes the new normal with technique and advance technology application. The lower completion in extended reach drilling (ERD) wells presents challenges due to the extended horizontal section and the complexity of well trajectory. The challenges frequently lead to problems such as the friction factor (FF), the effect of buckling, insufficient weight and limitation of rotation delivered to total depth (TD). The challenges increase in water injector (WI) wells, where the design uses a light casing design (LCD) approach to enhanced drilling efficiency, well duration, operational and cost effectiveness of the well injector. The LCD characteristic implies a lesser number of casings, which consequently allows for an extended section in both the surface and intermediate casing. The extended section preceding the 6″ horizontal sections which is 7″ liner affected the deployment of the 4-1/2″ lower completion run. In the planning stage of the well, two main concerns need to be considered to counter the challenges are the preparation of the open hole prior to running in hole and the configuration of running string. The drift run is an analog method used to measure the hole condition, as indicated by the friction factor during the trip in process. The friction factor is a theoretical value that characterizes the running behaviors, derived from surface hook load records. Additionally, torque and drag (T&D) simulations help analysis of what happens during the trip in, because in real situations drift runs might be unsuccessful to reach the target depth on elevator, requiring rotation to reach TD. In the market, advanced drilling and completion technology has been developed to counter the challenges and minimize risk during deployment of lower completion. Each well has different challenges and processes where the practice and technology selection should be fit for purpose, effective and efficient. The paper aims to present the concepts, challenges, and problem-solving strategies by exploring engineering analysis and operational perspectives in the context of a successful 4.5″ lower completion.

Authors

Institutions

Publication Details

Published
2025-04-21
DOI
https://doi.org/10.2118/224809-ms
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Understanding Running Behavior to Improve 4.5" Lower Completion in ERD Well Injector

Khalifa Qasem, Peter Levison Mwansa, Robertus Antoro, Mohamed Malalla et al.
Drilling and Well Engineering
article

Understanding Running Behavior to Improve 4.5" Lower Completion in ERD Well Injector

Khalifa Qasem, Peter Levison Mwansa, Robertus Antoro, Mohamed Malalla, Abdulraman Bahroom, Christoph Raszcyk, Hesham Mostafa, Ricardo Andres, Waseem Zuhair, Bryan Wong
article en

Abstract

Abstract The deployment of single trip 4.5″ lower completion in longer lateral and extended reach well to accommodate requirement of maximum reservoir contact (MRC) campaign especially in mature field with huge number of well drilled becomes the new normal with technique and advance technology application. The lower completion in extended reach drilling (ERD) wells presents challenges due to the extended horizontal section and the complexity of well trajectory. The challenges frequently lead to problems such as the friction factor (FF), the effect of buckling, insufficient weight and limitation of rotation delivered to total depth (TD). The challenges increase in water injector (WI) wells, where the design uses a light casing design (LCD) approach to enhanced drilling efficiency, well duration, operational and cost effectiveness of the well injector. The LCD characteristic implies a lesser number of casings, which consequently allows for an extended section in both the surface and intermediate casing. The extended section preceding the 6″ horizontal sections which is 7″ liner affected the deployment of the 4-1/2″ lower completion run. In the planning stage of the well, two main concerns need to be considered to counter the challenges are the preparation of the open hole prior to running in hole and the configuration of running string. The drift run is an analog method used to measure the hole condition, as indicated by the friction factor during the trip in process. The friction factor is a theoretical value that characterizes the running behaviors, derived from surface hook load records. Additionally, torque and drag (T&D) simulations help analysis of what happens during the trip in, because in real situations drift runs might be unsuccessful to reach the target depth on elevator, requiring rotation to reach TD. In the market, advanced drilling and completion technology has been developed to counter the challenges and minimize risk during deployment of lower completion. Each well has different challenges and processes where the practice and technology selection should be fit for purpose, effective and efficient. The paper aims to present the concepts, challenges, and problem-solving strategies by exploring engineering analysis and operational perspectives in the context of a successful 4.5″ lower completion.

Abu Dhabi National Oil (United Arab Emirates) (AE)
Openalex Percentile: Top 90%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.