Ensuring Well Integrity: Adaptive Cementing Solutions for Packed-Off Liners

Abstract The objective of this paper is to address the challenges that can develop after Liner RIH. Namely, liners that pack off during pre-cementing circulation. Such occurrences can lead to significant operational difficulties as the cementing of the Liner becomes impossible due to the inability to resume circulation from the annulus. This results in inadequate cementing, which compromises well integrity, poses a risk of potential well loss, and introduces environmental hazards such as contamination and fluid migration. To overcome these challenges, the method proposed in this paper provides detailed insights into cementing a packed-off liner through a series of strategically placed perforations. These perforations enable the cement to be squeezed behind the Liner, ensuring the desired zonal isolation. By deploying this technique, operators can achieve a significant improvement in operational efficiency and reduce risks associated with incomplete cementing. This paper underscores the critical importance of remedial cementing operations, which can be instrumental in situations where primary cementing proves unfeasible. Remedial cementing requires a specialized cement slurry formulation tailored to the specific well conditions. Additionally, the precise placement of cement plugs is crucial to ensuring the success of this process. This approach necessitates meticulous planning, involving hydraulic simulations, fluid compatibility testing, and operational risk assessments to minimize potential complications. The success of remedial cementing is validated through cement evaluation logs such as Cement Bond Logs (CBL), Variable Density Logs (VDL). The data revealed improved bonding with amplitude values below the acceptable thresholds, signifying competent cement where required. The proposed method not only ensures operational and environmental safety but also offers substantial cost savings for operators by reducing the need for expensive secondary interventions. This reinforces the importance of remedial cementing as a viable solution for mitigating issues arising from liner pack-offs during pre-cementing circulation.

Authors

Institutions

Publication Details

Published
2025-04-21
DOI
https://doi.org/10.2118/224771-ms
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Ensuring Well Integrity: Adaptive Cementing Solutions for Packed-Off Liners

M. A. Akbar, Md. Faizul Bari, Rosihan Anwar, S. Yousif
Drilling and Well Engineering
article

Ensuring Well Integrity: Adaptive Cementing Solutions for Packed-Off Liners

M. A. Akbar, Md. Faizul Bari, Rosihan Anwar, S. Yousif
article en

Abstract

Abstract The objective of this paper is to address the challenges that can develop after Liner RIH. Namely, liners that pack off during pre-cementing circulation. Such occurrences can lead to significant operational difficulties as the cementing of the Liner becomes impossible due to the inability to resume circulation from the annulus. This results in inadequate cementing, which compromises well integrity, poses a risk of potential well loss, and introduces environmental hazards such as contamination and fluid migration. To overcome these challenges, the method proposed in this paper provides detailed insights into cementing a packed-off liner through a series of strategically placed perforations. These perforations enable the cement to be squeezed behind the Liner, ensuring the desired zonal isolation. By deploying this technique, operators can achieve a significant improvement in operational efficiency and reduce risks associated with incomplete cementing. This paper underscores the critical importance of remedial cementing operations, which can be instrumental in situations where primary cementing proves unfeasible. Remedial cementing requires a specialized cement slurry formulation tailored to the specific well conditions. Additionally, the precise placement of cement plugs is crucial to ensuring the success of this process. This approach necessitates meticulous planning, involving hydraulic simulations, fluid compatibility testing, and operational risk assessments to minimize potential complications. The success of remedial cementing is validated through cement evaluation logs such as Cement Bond Logs (CBL), Variable Density Logs (VDL). The data revealed improved bonding with amplitude values below the acceptable thresholds, signifying competent cement where required. The proposed method not only ensures operational and environmental safety but also offers substantial cost savings for operators by reducing the need for expensive secondary interventions. This reinforces the importance of remedial cementing as a viable solution for mitigating issues arising from liner pack-offs during pre-cementing circulation.

Sprint (United States) (US), Mari Petroleum Company (Pakistan) (PK), SPRINT (NL)
Openalex Percentile: Top 90%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.