Research on Intelligent Calculation Method of Building Cost Management Supported by BIM Based Multi-Intelligent Body System

In order to realize the intelligent calculation of cost management during the implementation of construction projects, this paper proposes a methodological architecture based on Multi-intelligent Reinforcement Learning (MARL) and Building Information Model BIM.The construction cost management problem of the project is analyzed with examples in order to optimize the construction cost management and construction time management of ZZYH comprehensive business building.The results of the study show that a reasonable rebar path can be found through 40 independent simulation verifications, and the final convergence reaches 100%.Compared to manual savings, the collision-free rebar design using the computational framework of BIM and multi-intelligence saves roughly 90% of the time.In terms of optimizing the construction cost management of civil engineering, installation engineering, cable engineering, and overhead line engineering, the total amount of cost savings of the project amounted to 382,320,000 yuan.

Publication Details

Journal
Journal of Combinatorial Mathematics and Combinatorial Computing
Published
2025-04-18
DOI
https://doi.org/10.61091/jcmcc127b-180
Primary Topic
Industrial Technology and Control Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Intelligent Calculation Method of Building Cost Management Supported by BIM Based Multi-Intelligent Body System

Journal of Combinatorial Mathematics and Combinatorial Computing
Industrial Technology and Control Systems
article

Research on Intelligent Calculation Method of Building Cost Management Supported by BIM Based Multi-Intelligent Body System

article en

Abstract

In order to realize the intelligent calculation of cost management during the implementation of construction projects, this paper proposes a methodological architecture based on Multi-intelligent Reinforcement Learning (MARL) and Building Information Model BIM.The construction cost management problem of the project is analyzed with examples in order to optimize the construction cost management and construction time management of ZZYH comprehensive business building.The results of the study show that a reasonable rebar path can be found through 40 independent simulation verifications, and the final convergence reaches 100%.Compared to manual savings, the collision-free rebar design using the computational framework of BIM and multi-intelligence saves roughly 90% of the time.In terms of optimizing the construction cost management of civil engineering, installation engineering, cable engineering, and overhead line engineering, the total amount of cost savings of the project amounted to 382,320,000 yuan.

Journal of Combinatorial Mathematics and Combinatorial ComputingVol. 127b
Openalex Percentile: Top 92%
Industrial Technology and Control Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.