PRODUCTIVITY INDEX IN HORIZONTAL WELL

The work in this project studied the productivity index of horizontal wells in the Mabruk (west Mabruk) oil field. Different aspects of horizontal wells were reviewed; including drilling and completion technologies, limitations and applications. Different method were used to calculate productivity index under steady state (e.g ,Borisov's ,Joshi's ,Giger and Renard and Dupuy ,methods) and pseudo steady state conditions (e.g. the Mutalik et al , Babu and Odeh , Kuchuk et al methods) of the horizontal well were also reviewed. The factors effect pressure drops between the reservoir and the wellbore such as well length, permeability, reservoir thickness, drainage area, fluid viscosity, and perforation percentage. Horizontal drilling has been used successfully to Increase the productivity of reservoirs; many formulas can be used to compute the productivity of horizontal compared to vertical ones. The objectives of this work are to identify the different flow regimes in Horizontal Wells and reservoir parameters that are required to calculate the Productivity Index and to compare the Productivity between the different methods in Horizontal Wells.

Authors

Institutions

Publication Details

Journal
Malaysian Journal of Industrial Technology
Published
2024-12-01
DOI
https://doi.org/10.70672/sy2mzy09
Citations
2
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.34
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PRODUCTIVITY INDEX IN HORIZONTAL WELL

Abdallah Mohammed Alshobaky, Wanis Salem Abdal
2 citations
Malaysian Journal of Industrial Technology
Reservoir Engineering and Simulation Methods
0.34
article

PRODUCTIVITY INDEX IN HORIZONTAL WELL

Abdallah Mohammed Alshobaky, Wanis Salem Abdal
article en
2 citations

Abstract

The work in this project studied the productivity index of horizontal wells in the Mabruk (west Mabruk) oil field. Different aspects of horizontal wells were reviewed; including drilling and completion technologies, limitations and applications. Different method were used to calculate productivity index under steady state (e.g ,Borisov's ,Joshi's ,Giger and Renard and Dupuy ,methods) and pseudo steady state conditions (e.g. the Mutalik et al , Babu and Odeh , Kuchuk et al methods) of the horizontal well were also reviewed. The factors effect pressure drops between the reservoir and the wellbore such as well length, permeability, reservoir thickness, drainage area, fluid viscosity, and perforation percentage. Horizontal drilling has been used successfully to Increase the productivity of reservoirs; many formulas can be used to compute the productivity of horizontal compared to vertical ones. The objectives of this work are to identify the different flow regimes in Horizontal Wells and reservoir parameters that are required to calculate the Productivity Index and to compare the Productivity between the different methods in Horizontal Wells.

Malaysian Journal of Industrial TechnologyVol. 8(4)
Zaytuna College (US)
Openalex Percentile: Top 36%
Reservoir Engineering and Simulation Methods
0.34
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

PRODUCTIVITY INDEX IN HORIZONTAL WELL — Abdallah Mohammed Alshobaky, Wanis Salem Abdal · Malaysian Journal of Industrial Technology (2024) | TGRS Research Map | TGRS