Analisis Pemborosan Menggunakan Waste Assessment Model (WAM) pada Proses Penyediaan Unit pada Distributor Perdagangan

The distribution company for agricultural, construction, and infrastructure equipment is experiencing delays in the supply of units, which can lead to resource depletion and potentially cause customer loss. Supply delays represent a form of waste that must be eliminated. This study aims to identify the causes of the delays using the waste assessment model approach. Data was collected through questionnaires and interviews conducted with assembly supervisors and team leaders. Data processing utilized the waste assessment model, which consists of the waste relationship matrix (WRM) and the waste assessment questionnaire (WAQ). The WRM results indicated a strong correlation between defects, processes, overproduction, and inventory, while the WAQ results showed the largest waste occurred in inventory, motion, and waiting. The highest waste in this study was identified as defects, inventory, and motion. The results of this research are expected to provide effective recommendations to reduce supply delays and improve the company's operational efficiency. Consequently, the company can maintain and even enhance customer satisfaction, as well as optimize the distribution process of agricultural, construction, and infrastructure equipment. Keywords: Distributor, Supply Delays, Waste, WAM

Authors

Institutions

Publication Details

Journal
Industrika Jurnal Ilmiah Teknik Industri
Published
2025-04-15
DOI
https://doi.org/10.37090/indstrk.v9i2.1706
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Pemborosan Menggunakan Waste Assessment Model (WAM) pada Proses Penyediaan Unit pada Distributor Perdagangan

Ahmad Marsudin, Muhammad Kholil
Industrika Jurnal Ilmiah Teknik Industri
Management and Optimization Techniques
article

Analisis Pemborosan Menggunakan Waste Assessment Model (WAM) pada Proses Penyediaan Unit pada Distributor Perdagangan

Ahmad Marsudin, Muhammad Kholil
article en

Abstract

The distribution company for agricultural, construction, and infrastructure equipment is experiencing delays in the supply of units, which can lead to resource depletion and potentially cause customer loss. Supply delays represent a form of waste that must be eliminated. This study aims to identify the causes of the delays using the waste assessment model approach. Data was collected through questionnaires and interviews conducted with assembly supervisors and team leaders. Data processing utilized the waste assessment model, which consists of the waste relationship matrix (WRM) and the waste assessment questionnaire (WAQ). The WRM results indicated a strong correlation between defects, processes, overproduction, and inventory, while the WAQ results showed the largest waste occurred in inventory, motion, and waiting. The highest waste in this study was identified as defects, inventory, and motion. The results of this research are expected to provide effective recommendations to reduce supply delays and improve the company's operational efficiency. Consequently, the company can maintain and even enhance customer satisfaction, as well as optimize the distribution process of agricultural, construction, and infrastructure equipment. Keywords: Distributor, Supply Delays, Waste, WAM

Industrika Jurnal Ilmiah Teknik IndustriVol. 9(2)
Mercu Buana University (ID)
Openalex Percentile: Top 89%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.