Multiobjective optimization decision-making on electricity procurement for grid companies considering imbalanced funds under a dual-track system

With the deepening reform of the electricity market, grid companies face multiple complex economic and policy constraints in the process of power procurement and sales. This study proposed a new optimization model for electricity procurement by grid companies, addressing the challenges arising from the imbalanced scale of dual-track system funds. The proposed model integrated the cost considerations of grid companies in electricity trading with the issue of dualtrack system funding imbalance. A multi-objective decision-making framework was developed, aiming to minimize the procurement costs for end-users while controlling the scale of the dual-track system imbalance funds. The optimization of the grid company's procurement strategy was conducted under constraints including user-side demand and mediumto-long-term procurement requirements. The model was solved using an improved particle swarm optimization (PSO) algorithm, providing an optimized solution for grid companies in procuring electricity. Simulation results confirm that the proposed model can effectively reduce electricity procurement costs for grid companies while controlling the scale of the dual-track imbalance funds. The multi-objective optimization decision-making on electricity procurement for grid companies under a dual-track system is effective and feasible.

Authors

Institutions

Publication Details

Published
2025-04-18
DOI
https://doi.org/10.1117/12.3064799
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multiobjective optimization decision-making on electricity procurement for grid companies considering imbalanced funds under a dual-track system

Huasheng Huang, Xingang Zhou, Yuqing Duan, Shuyou Wang et al.
Electric Power System Optimization
article

Multiobjective optimization decision-making on electricity procurement for grid companies considering imbalanced funds under a dual-track system

Huasheng Huang, Xingang Zhou, Yuqing Duan, Shuyou Wang, Sen Guo, Ximing Chen
article en

Abstract

With the deepening reform of the electricity market, grid companies face multiple complex economic and policy constraints in the process of power procurement and sales. This study proposed a new optimization model for electricity procurement by grid companies, addressing the challenges arising from the imbalanced scale of dual-track system funds. The proposed model integrated the cost considerations of grid companies in electricity trading with the issue of dualtrack system funding imbalance. A multi-objective decision-making framework was developed, aiming to minimize the procurement costs for end-users while controlling the scale of the dual-track system imbalance funds. The optimization of the grid company's procurement strategy was conducted under constraints including user-side demand and mediumto-long-term procurement requirements. The model was solved using an improved particle swarm optimization (PSO) algorithm, providing an optimized solution for grid companies in procuring electricity. Simulation results confirm that the proposed model can effectively reduce electricity procurement costs for grid companies while controlling the scale of the dual-track imbalance funds. The multi-objective optimization decision-making on electricity procurement for grid companies under a dual-track system is effective and feasible.

North China Electric Power University (CN), State Grid Corporation of China (China) (CN), Shanghai Electric (China) (CN)
Openalex Percentile: Top 94%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Multiobjective optimization decision-making on electricity procurement for grid companies considering imbalanced funds under a dual-track system — Huasheng Huang, Xingang Zhou, et al. · (2025) | TGRS Research Map | TGRS