Experimental Research on Safety Clearance of Live Working in UHV Line Based on Medium Helicopter Hanging Basket Method

In order to ensure the safety of UHV transmission line helicopter in live working, a test study on safety gap in live working is carried out. Combined with the working characteristics, basket and UHV line parameters based on the helicopter live working with suspension method, 4 typical working conditions were analyzed and defined. The test platform was built according to the ratio of 1: 1 and the shock discharge characteristic curve of air gap operation in each typical working condition was obtained through the ground and phase discharge tests. The minimum phase-ground and phase-to-phase safety gap value of helicopter live working with suspension method in 1000kV UHV line is determined and the research results provide a technical basis for carrying out live working safely.

Authors

Institutions

Publication Details

Published
2024-12-27
DOI
https://doi.org/10.1109/isneet64164.2024.10956118
Primary Topic
High-Voltage Power Transmission Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Experimental Research on Safety Clearance of Live Working in UHV Line Based on Medium Helicopter Hanging Basket Method

Yong Peng, Haomiao Wang, Nan Wang, Yi Wang et al.
High-Voltage Power Transmission Systems
article

Experimental Research on Safety Clearance of Live Working in UHV Line Based on Medium Helicopter Hanging Basket Method

Yong Peng, Haomiao Wang, Nan Wang, Yi Wang, Ruixun Qiao, Xiaobing Guo, Zhonghu Shan
article en

Abstract

In order to ensure the safety of UHV transmission line helicopter in live working, a test study on safety gap in live working is carried out. Combined with the working characteristics, basket and UHV line parameters based on the helicopter live working with suspension method, 4 typical working conditions were analyzed and defined. The test platform was built according to the ratio of 1: 1 and the shock discharge characteristic curve of air gap operation in each typical working condition was obtained through the ground and phase discharge tests. The minimum phase-ground and phase-to-phase safety gap value of helicopter live working with suspension method in 1000kV UHV line is determined and the research results provide a technical basis for carrying out live working safely.

China Electric Power Research Institute
Openalex Percentile: Top 73%
High-Voltage Power Transmission Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.