Retrofitting Methods for Existing Wind Turbine Foundations and Their Responses Under Wind Loads

As the demand for renewable energy continues to rise, the wind power industry is shifting its focus from the quantity of installed turbines to higher-capacity installations. Consequently, foundation loads increase when the upper turbine is replaced with a larger one, potentially leading to insufficient connection strength between the tower and the foundation ring. To address this issue, this study proposes two retrofit methods: The internal and external combined-connection methods. These methods aim to enhance the connection strength between the wind turbine tower and the foundation by incorporating anchor bolts, additional foundation rings, and post-cast concrete. Three wind turbine-foundation-soil finite element models were established using ABAQUS: One with the existing foundation, one retrofitted using the internal combined-connection method, and one retrofitted using the external combined-connection method. Under the same wind load, the dynamic responses of the three models were compared to evaluate the effectiveness of the internal and external combined-connection methods for foundation retrofitting. This study shows that the internal and external combined-connection methods effectively reduce the stress levels in the anchor bolts, foundation ring, and foundation, with the external combined-connection method yielding better retrofit results. After retrofitting the foundation using the internal and external combined-connection methods, the maximum stresses in the anchor bolts, foundation ring, concrete, and reinforcement cage were reduced by 35.77% and 41.84%, 34.50% and 38.36%, 23.85% and 27.87%, and 39.23% and 45.38%, respectively. However, although both methods have a beneficial effect on the wind turbine structure, their improvement is limited compared to their impact on the anchor bolts, foundation ring, and foundation.

Authors

Institutions

Publication Details

Journal
International Journal of Structural Stability and Dynamics
Published
2025-04-17
DOI
https://doi.org/10.1142/s0219455426502834
Citations
2
Primary Topic
Structural Engineering and Vibration Analysis
Type
article
Field-Weighted Citation Impact
1.91
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Retrofitting Methods for Existing Wind Turbine Foundations and Their Responses Under Wind Loads

Songzhao Qu, Wenming Wang, Huichao Ma, Zhenli Zhang et al.
2 citations
International Journal of Structural Stability and Dynamics
Structural Engineering and Vibration Analysis
1.91
article

Retrofitting Methods for Existing Wind Turbine Foundations and Their Responses Under Wind Loads

Songzhao Qu, Wenming Wang, Huichao Ma, Zhenli Zhang, Zhuoqun Zhang, Z. L. Dou
article en
2 citations

Abstract

As the demand for renewable energy continues to rise, the wind power industry is shifting its focus from the quantity of installed turbines to higher-capacity installations. Consequently, foundation loads increase when the upper turbine is replaced with a larger one, potentially leading to insufficient connection strength between the tower and the foundation ring. To address this issue, this study proposes two retrofit methods: The internal and external combined-connection methods. These methods aim to enhance the connection strength between the wind turbine tower and the foundation by incorporating anchor bolts, additional foundation rings, and post-cast concrete. Three wind turbine-foundation-soil finite element models were established using ABAQUS: One with the existing foundation, one retrofitted using the internal combined-connection method, and one retrofitted using the external combined-connection method. Under the same wind load, the dynamic responses of the three models were compared to evaluate the effectiveness of the internal and external combined-connection methods for foundation retrofitting. This study shows that the internal and external combined-connection methods effectively reduce the stress levels in the anchor bolts, foundation ring, and foundation, with the external combined-connection method yielding better retrofit results. After retrofitting the foundation using the internal and external combined-connection methods, the maximum stresses in the anchor bolts, foundation ring, concrete, and reinforcement cage were reduced by 35.77% and 41.84%, 34.50% and 38.36%, 23.85% and 27.87%, and 39.23% and 45.38%, respectively. However, although both methods have a beneficial effect on the wind turbine structure, their improvement is limited compared to their impact on the anchor bolts, foundation ring, and foundation.

International Journal of Structural Stability and Dynamics
Henan University of Urban Construction (CN), China Communications Construction Company (China) (CN), Economic Research Institute (BG), China Power Engineering Consulting Group (China) (CN), Economic Research Institute (KZ), Shandong Jianzhu University (CN)
Affordable and clean energy
Openalex Percentile: Top 16%
Structural Engineering and Vibration Analysis
1.91
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.