Simulation analysis of distance protection maloperation caused by sympathetic inrush current in transformer
Abstract After the successful startup of the #2 main transformer at the 110kV Ruixia Substation under no-load conditions, the no-load closing of the #1 main transformer caused an incorrect operation of the distance protection, affecting four protection zones. Through theoretical analysis, it was determined that this issue resulted from the sympathetic inrush current. Additionally, a detailed PSCAD electromagnetic transient simulation model was created to further simulate and verify the event. Based on these simulations, a practical and feasible solution was proposed. This paper presents both theoretical and simulation-based analysis of an actual grid event, offering valuable insights for analyzing similar incidents and preventing their recurrence.
Authors
- Gang‐Ding Peng (ORCID: https://orcid.org/0000-0001-7984-8925)
- Yao Zhou (ORCID: https://orcid.org/0000-0002-9028-6035)
- Jigang Xu (ORCID: https://orcid.org/0000-0001-7640-3613)
- Yi Mei (ORCID: https://orcid.org/0000-0003-0682-1363)
- Xia Jing (ORCID: https://orcid.org/0000-0001-9932-3157)
Institutions
- Electric Power Research Institute (US)
- State Grid Corporation of China (China) (CN)
- Economic Research Institute (BG)
Publication Details
- Journal
- Journal of Physics Conference Series
- Published
- 2025-04-01
- DOI
- https://doi.org/10.1088/1742-6596/2993/1/012054
- Primary Topic
- Magnetic Properties and Applications
- Type
- article
- Field-Weighted Citation Impact
- 0.00