Innovation and product positioning: When to add or replace

We consider a monopolist firm, currently active in the market, which has the opportunity to innovate by introducing a new product. This involves decisions about the timing, quality, and positioning relative to the established product. To study this problem, we use the Hotelling line model. Moreover, we introduce demand uncertainty. The main result is that when the established product is sufficiently profitable, it will be replaced by the new product in the long run. This result is reinforced by demand uncertainty, which delays the new product introduction. Adding the new product alongside the established product so that they are both available for sale after the new product is introduced, may occur when the unit production cost of the new product is small. In the latter scenario, a hysteresis region may arise where the firm waits, while at lower demand levels, it immediately adds the new product alongside the established product, and at higher demand levels it immediately replaces the established product with the new one.

Authors

Publication Details

Journal
Omega
Published
2025-04-15
DOI
https://doi.org/10.1016/j.omega.2025.103327
Citations
1
Primary Topic
Capital Investment and Risk Analysis
Type
article
Field-Weighted Citation Impact
2.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Innovation and product positioning: When to add or replace

Peter M. Kort, Diogo Pereira, Cláudia Nunes, Anne Balter
1 citations
Omega
Capital Investment and Risk Analysis
2.21
article

Innovation and product positioning: When to add or replace

Peter M. Kort, Diogo Pereira, Cláudia Nunes, Anne Balter
article en
1 citations

Abstract

We consider a monopolist firm, currently active in the market, which has the opportunity to innovate by introducing a new product. This involves decisions about the timing, quality, and positioning relative to the established product. To study this problem, we use the Hotelling line model. Moreover, we introduce demand uncertainty. The main result is that when the established product is sufficiently profitable, it will be replaced by the new product in the long run. This result is reinforced by demand uncertainty, which delays the new product introduction. Adding the new product alongside the established product so that they are both available for sale after the new product is introduced, may occur when the unit production cost of the new product is small. In the latter scenario, a hysteresis region may arise where the firm waits, while at lower demand levels, it immediately adds the new product alongside the established product, and at higher demand levels it immediately replaces the established product with the new one.

OmegaVol. 136
Industry, innovation and infrastructure
Openalex Percentile: Top 15%
Capital Investment and Risk Analysis
2.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.