Retrofit or new construction? Strategic budget allocation to improve transportation network redundancy under uncertain disruptions

• Provide an efficient tool for resilience-oriented transportation planning. • Justify model solutions theoretically and through numerical experiments. • Explore complementary advantages of link construction and retrofitting. • Highlight the tradeoff between new construction and redundancy improvement. • Recommend retrofitting in cases of high disruption probability and cost disparity. Enhancing transportation network redundancy is an effective approach to proactively improving network resilience and mitigating the consequences of potential disruptions. This research addresses a route diversity redundancy-oriented strategic transportation network planning problem that involves the integration of two typical means: (1) constructing new infrastructure (e.g., road segments and bridges) and (2) retrofitting existing infrastructure. The two means differ in their mechanisms, effectiveness, and costs. To determine the optimal budget allocation between the two means, we establish a stochastic programming model that minimizes the expected loss of network redundancy (measured by network-level efficient routes) under uncertain disruptions. To overcome challenges due to the non-explicit redundancy formulation and the exponentially growing solution space, we provide an approximation algorithm to efficiently solve the model. Model extensions to include practical concerns, such as planners’ preferences for new construction and fairness in O-D-level redundancy, are also discussed. Using the 0–1 knapsack transformation, we theoretically elucidate the tradeoffs and priorities in retrofitting and new construction under varying disruption probabilities and cost disparities between the two means. We show the features of the model solutions and the applicability of the method using a 16-node network and the realistic Winnipeg network. We demonstrate that the model flexibly adjusts the budget allocation ratio between new link construction and link retrofitting under various conditions of disruption probability, cost disparity and budget level, effectively leveraging their complementary advantages to enhance network redundancy. In conditions with low disruption probabilities, low ratios of new link construction cost to retrofitting cost, and sufficient budgets, the scheme tends to favor new link construction. However, increasing the allocation for constructing new links — while beneficial for redundancy in the normal state — may conflict with reducing redundancy loss under disruptive events. Notably, we identify a critical budget threshold beyond which redundancy loss transitions from positive to negative, offering insights for determining appropriate budget levels. The proposed mathematical framework and numerical findings may provide practical support for planners in justifying redundancy-oriented decision-making (e.g., project prioritization), contributing to advancing efforts toward resilient urban infrastructure planning.

Authors

Institutions

Publication Details

Journal
Transportation Research Part E Logistics and Transportation Review
Published
2025-04-15
DOI
https://doi.org/10.1016/j.tre.2025.104131
Citations
5
Primary Topic
Transportation Planning and Optimization
Type
article
Field-Weighted Citation Impact
10.88

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Retrofit or new construction? Strategic budget allocation to improve transportation network redundancy under uncertain disruptions

Kai Qu, Xiangdong Xu, Weiwen Zhou, Anthony Chen
5 citations
Transportation Research Part E Logistics and Transportation Review
Transportation Planning and Optimization
10.88
article

Retrofit or new construction? Strategic budget allocation to improve transportation network redundancy under uncertain disruptions

Kai Qu, Xiangdong Xu, Weiwen Zhou, Anthony Chen
article en
5 citations

Abstract

• Provide an efficient tool for resilience-oriented transportation planning. • Justify model solutions theoretically and through numerical experiments. • Explore complementary advantages of link construction and retrofitting. • Highlight the tradeoff between new construction and redundancy improvement. • Recommend retrofitting in cases of high disruption probability and cost disparity. Enhancing transportation network redundancy is an effective approach to proactively improving network resilience and mitigating the consequences of potential disruptions. This research addresses a route diversity redundancy-oriented strategic transportation network planning problem that involves the integration of two typical means: (1) constructing new infrastructure (e.g., road segments and bridges) and (2) retrofitting existing infrastructure. The two means differ in their mechanisms, effectiveness, and costs. To determine the optimal budget allocation between the two means, we establish a stochastic programming model that minimizes the expected loss of network redundancy (measured by network-level efficient routes) under uncertain disruptions. To overcome challenges due to the non-explicit redundancy formulation and the exponentially growing solution space, we provide an approximation algorithm to efficiently solve the model. Model extensions to include practical concerns, such as planners’ preferences for new construction and fairness in O-D-level redundancy, are also discussed. Using the 0–1 knapsack transformation, we theoretically elucidate the tradeoffs and priorities in retrofitting and new construction under varying disruption probabilities and cost disparities between the two means. We show the features of the model solutions and the applicability of the method using a 16-node network and the realistic Winnipeg network. We demonstrate that the model flexibly adjusts the budget allocation ratio between new link construction and link retrofitting under various conditions of disruption probability, cost disparity and budget level, effectively leveraging their complementary advantages to enhance network redundancy. In conditions with low disruption probabilities, low ratios of new link construction cost to retrofitting cost, and sufficient budgets, the scheme tends to favor new link construction. However, increasing the allocation for constructing new links — while beneficial for redundancy in the normal state — may conflict with reducing redundancy loss under disruptive events. Notably, we identify a critical budget threshold beyond which redundancy loss transitions from positive to negative, offering insights for determining appropriate budget levels. The proposed mathematical framework and numerical findings may provide practical support for planners in justifying redundancy-oriented decision-making (e.g., project prioritization), contributing to advancing efforts toward resilient urban infrastructure planning.

Transportation Research Part E Logistics and Transportation ReviewVol. 198
Tongji University (CN), Hong Kong Polytechnic University (HK), Shanghai Urban Transportation Design Institute (China) (CN)
National Natural Science Foundation of China, University Grants Committee, Research Grants Council, University Grants Committee
Openalex Percentile: Top 2%
Transportation Planning and Optimization
10.88
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.