Economic Analysis of Mid-Term and Long-Term Power Transmission Corridors Access to Beijing and New Power Transmission and Transformation Projects in Beijing

Under the goals of carbon peak and carbon neutrality, accommodating and integrating a high proportion of renewable energy is a key challenge we currently face. The power grid as a crucial bridge between power generation and consumption, plays a significant role in ensuring electricity supply, integrating renewable energy, and optimizing power dispatch. However, as electricity trading matures, traditional grid transmission and transformation project planning methods are no longer sufficient to meet the capacity assessment needs in the electricity market environment. Therefore, it is necessary to consider electricity market factors when planning grid investments to optimize the economic performance of the main grid. This paper utilizes an 8760-hour planning and simulation platform to analyze the 2035 main grid planning scheme around Beijing proposed by the North China Branch of the State Grid. Taking into account the power spot market environment and the long-term source-network-load characteristics of the Beijing-Tianjin-Tangshan area, it examines the economics of the mid-term and long-term access corridor planning scheme and the transmission and substation project around Beijing, providing strong support for the feasibility of the planning scheme.

Authors

Institutions

Publication Details

Published
2025-01-10
DOI
https://doi.org/10.1109/iceaai64185.2025.10957363
Primary Topic
Transportation Planning and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Economic Analysis of Mid-Term and Long-Term Power Transmission Corridors Access to Beijing and New Power Transmission and Transformation Projects in Beijing

Hao Sun, Qian Ma, Gang Luo, Jing Zhang et al.
Transportation Planning and Optimization
article

Economic Analysis of Mid-Term and Long-Term Power Transmission Corridors Access to Beijing and New Power Transmission and Transformation Projects in Beijing

Hao Sun, Qian Ma, Gang Luo, Jing Zhang, Hao Shi, Wei Zhao, Fuqiang Li, Peng Xu, Yan Pan
article en

Abstract

Under the goals of carbon peak and carbon neutrality, accommodating and integrating a high proportion of renewable energy is a key challenge we currently face. The power grid as a crucial bridge between power generation and consumption, plays a significant role in ensuring electricity supply, integrating renewable energy, and optimizing power dispatch. However, as electricity trading matures, traditional grid transmission and transformation project planning methods are no longer sufficient to meet the capacity assessment needs in the electricity market environment. Therefore, it is necessary to consider electricity market factors when planning grid investments to optimize the economic performance of the main grid. This paper utilizes an 8760-hour planning and simulation platform to analyze the 2035 main grid planning scheme around Beijing proposed by the North China Branch of the State Grid. Taking into account the power spot market environment and the long-term source-network-load characteristics of the Beijing-Tianjin-Tangshan area, it examines the economics of the mid-term and long-term access corridor planning scheme and the transmission and substation project around Beijing, providing strong support for the feasibility of the planning scheme.

State Grid Corporation of China (China) (CN), OriginWater (China) (CN)
Openalex Percentile: Top 92%
Transportation Planning and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Economic Analysis of Mid-Term and Long-Term Power Transmission Corridors Access to Beijing and New Power Transmission and Transformation Projects in Beijing — Hao Sun, Qian Ma, et al. · (2025) | TGRS Research Map | TGRS