A Whale Optimization Algorithm based Solver for No-wait Flexible Flow Shop Scheduling Problems

No-wait Flexible Flow Shop Scheduling (NWFFSSP) is one class of scheduling problems found in production scheduling. An interesting characteristic of NWFFSSP is the requirement that jobs be processed continuously without a break from one particular stage to the next. Good production scheduling considers objectives such as minimizing the total production time (makespan) and the resulting CPU Time. In this paper, NWFFSSP is solved using the Whale Optimization Algorithm (WOA) metaheuristic algorithm to minimize two objectives, namely the total production time (makespan) and CPU Time. The experimental results conclude that makespan is inversely proportional to the population size and the number of iterations. In contrast, CPU time is directly proportional to the number of whales and iterations. Compared to the other three metaheuristics, namely Genetic Algorithm (GA), Simulated Annealing (SA), and Minimum Deviation Algorithm (MDA), WOA has the best performance in terms of makespan for small-sized problems. While in terms of time, although it does not outperform MDA, WOA is generally better than SA and GA.

Authors

Institutions

Publication Details

Published
2024-10-24
DOI
https://doi.org/10.1109/icic64337.2024.10956970
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Whale Optimization Algorithm based Solver for No-wait Flexible Flow Shop Scheduling Problems

Cecilia Esti Nugraheni, Luciana Abednego, Stanley Jonathan
Scheduling and Optimization Algorithms
article

A Whale Optimization Algorithm based Solver for No-wait Flexible Flow Shop Scheduling Problems

Cecilia Esti Nugraheni, Luciana Abednego, Stanley Jonathan
article en

Abstract

No-wait Flexible Flow Shop Scheduling (NWFFSSP) is one class of scheduling problems found in production scheduling. An interesting characteristic of NWFFSSP is the requirement that jobs be processed continuously without a break from one particular stage to the next. Good production scheduling considers objectives such as minimizing the total production time (makespan) and the resulting CPU Time. In this paper, NWFFSSP is solved using the Whale Optimization Algorithm (WOA) metaheuristic algorithm to minimize two objectives, namely the total production time (makespan) and CPU Time. The experimental results conclude that makespan is inversely proportional to the population size and the number of iterations. In contrast, CPU time is directly proportional to the number of whales and iterations. Compared to the other three metaheuristics, namely Genetic Algorithm (GA), Simulated Annealing (SA), and Minimum Deviation Algorithm (MDA), WOA has the best performance in terms of makespan for small-sized problems. While in terms of time, although it does not outperform MDA, WOA is generally better than SA and GA.

Parahyangan Catholic University (ID)
Ministry of Education
Openalex Percentile: Top 57%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.