Analysis the Influence of Manpower, Material, Machine, Method, Money and Environment on the Time Performance of Implementing Cold Storage Building Projects

Cold Storage Building is a building specifically designed to maintain room temperature in very cold conditions which functions as a commodity preservation area so that it can be stored fresh for a long period of time. When constructing a Cold Storage Building, a very specialist construction process is required. Therefore, it must be carried out using a certain construction method (modular construction), using special Materials (sandwich panels), requiring several specialist subcons & a lack of experienced workers. These conditions make the challenge of building a Cold Storage Building more difficult, which can affect the time performance of the project. This research aims to analyze factors that can influence time performance in the implementation of the Cold Storage Building construction project using the Multiple Linear Regression Analysis method. Based on data analysis, the equation Y = 3.166 + 0.108 X1 + 0.208 X2 + 0.040 X3 + 0.112 X4 + 0.164 Based on the results of the Coefficient of Determination Test, simultaneously Manpower Factors (X1), Material Factors (X2), Machine Factors (X3), Method Factors (X4), Money Factors (X5) and Environment Factors (X6) have an influence contribution of 87.6 % of Time Performance (Y). Meanwhile, for the results of the most dominant factors analysis using Beta Standardized x Zero-Order, it was found that the Material Factors (X2) was the most dominant factors that could influence time performance with an influence value of 34.01%. Considerations in determining alternative solutions to improve time performance on Cold Storage Building construction projects are carried out on the most dominant factors, namely the Material Factors (X2).

Authors

Publication Details

Journal
ASTONJADRO
Published
2024-12-31
DOI
https://doi.org/10.32832/astonjadro.v14i1.16389
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis the Influence of Manpower, Material, Machine, Method, Money and Environment on the Time Performance of Implementing Cold Storage Building Projects

Agus Suroso, Mawardi Amin, Febrian Eka Nurrizky
ASTONJADRO
Advanced Manufacturing and Logistics Optimization
article

Analysis the Influence of Manpower, Material, Machine, Method, Money and Environment on the Time Performance of Implementing Cold Storage Building Projects

Agus Suroso, Mawardi Amin, Febrian Eka Nurrizky
article en

Abstract

Cold Storage Building is a building specifically designed to maintain room temperature in very cold conditions which functions as a commodity preservation area so that it can be stored fresh for a long period of time. When constructing a Cold Storage Building, a very specialist construction process is required. Therefore, it must be carried out using a certain construction method (modular construction), using special Materials (sandwich panels), requiring several specialist subcons & a lack of experienced workers. These conditions make the challenge of building a Cold Storage Building more difficult, which can affect the time performance of the project. This research aims to analyze factors that can influence time performance in the implementation of the Cold Storage Building construction project using the Multiple Linear Regression Analysis method. Based on data analysis, the equation Y = 3.166 + 0.108 X1 + 0.208 X2 + 0.040 X3 + 0.112 X4 + 0.164 Based on the results of the Coefficient of Determination Test, simultaneously Manpower Factors (X1), Material Factors (X2), Machine Factors (X3), Method Factors (X4), Money Factors (X5) and Environment Factors (X6) have an influence contribution of 87.6 % of Time Performance (Y). Meanwhile, for the results of the most dominant factors analysis using Beta Standardized x Zero-Order, it was found that the Material Factors (X2) was the most dominant factors that could influence time performance with an influence value of 34.01%. Considerations in determining alternative solutions to improve time performance on Cold Storage Building construction projects are carried out on the most dominant factors, namely the Material Factors (X2).

ASTONJADROVol. 14(1)
Openalex Percentile: Top 57%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.