Optimizing construction duration estimation and monitoring for public building projects in Addis Ababa through an integrated deterministic and probabilistic conceptual model

Effective time estimation and monitoring are crucial for the success of public building projects, especially in complex environments like Addis Ababa, where project delivery methods introduce considerable uncertainties. Existing practices in Addis Ababa often lead to unreliable schedules and increased risk. This study addresses these issues by developing an integrated conceptual model that merges deterministic and probabilistic approaches to enhance schedule accuracy and reliability. The model incorporates factors such as project scope, regulatory requirements, site conditions, contractual terms, historical data, resource availability, and economic and political influences. Data was collected from clients, consultants, and project supervisors on construction duration estimation, time monitoring, and delivery system uncertainties. Key influential parameters identified include the number of buildings, regulatory approvals, government shutdowns, project locations, risk management strategies, and site conditions. The model proposes using historical data and expert judgment to establish baseline durations, which are adjusted for factors like regulatory delays and site-specific conditions. It employs probabilistic methods like Monte Carlo simulations and PERT to account for variability. The integrated approach combines these results to provide a comprehensive project duration estimate and includes a roadmap for implementation in R and Python, validated using MAE, RMSE, and R2 metrics.

Authors

Institutions

Publication Details

Journal
Journal of Asian Architecture and Building Engineering
Published
2025-04-14
DOI
https://doi.org/10.1080/13467581.2025.2486744
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing construction duration estimation and monitoring for public building projects in Addis Ababa through an integrated deterministic and probabilistic conceptual model

Walied A. Elsaigh, Soreti Merga Liben, Demiss A. Belachew
Journal of Asian Architecture and Building Engineering
Construction Project Management and Performance
article

Optimizing construction duration estimation and monitoring for public building projects in Addis Ababa through an integrated deterministic and probabilistic conceptual model

Walied A. Elsaigh, Soreti Merga Liben, Demiss A. Belachew
article en

Abstract

Effective time estimation and monitoring are crucial for the success of public building projects, especially in complex environments like Addis Ababa, where project delivery methods introduce considerable uncertainties. Existing practices in Addis Ababa often lead to unreliable schedules and increased risk. This study addresses these issues by developing an integrated conceptual model that merges deterministic and probabilistic approaches to enhance schedule accuracy and reliability. The model incorporates factors such as project scope, regulatory requirements, site conditions, contractual terms, historical data, resource availability, and economic and political influences. Data was collected from clients, consultants, and project supervisors on construction duration estimation, time monitoring, and delivery system uncertainties. Key influential parameters identified include the number of buildings, regulatory approvals, government shutdowns, project locations, risk management strategies, and site conditions. The model proposes using historical data and expert judgment to establish baseline durations, which are adjusted for factors like regulatory delays and site-specific conditions. It employs probabilistic methods like Monte Carlo simulations and PERT to account for variability. The integrated approach combines these results to provide a comprehensive project duration estimate and includes a roadmap for implementation in R and Python, validated using MAE, RMSE, and R2 metrics.

Journal of Asian Architecture and Building Engineering
University of South Africa (ZA), Addis Ababa Science and Technology University (ET)
Sustainable cities and communities
Openalex Percentile: Top 91%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimizing construction duration estimation and monitoring for public building projects in Addis Ababa through an integrated deterministic and probabilistic conceptual model — Walied A. Elsaigh, Soreti Merga Liben, et al. · Journal of Asian Architecture and Building Engineering (2025) | TGRS Research Map | TGRS