Assessing the Metrological Reliability of Static Firing Tests of Rocket Motors Through the Evaluation of Thrust and Total Impulse Measurement Uncertainty

A solid propellant rocket motor is a propulsion system used in missiles and rockets that burns a propellant, typically composed of a mixture of fuel and an oxidizer, to generate the thrust necessary to propel the vehicle. During both the development and quality assurance phases, static firing tests of rocket motors are conducted to verify whether the system requirements meet the product specifications. These tests aim to produce two main types of graphs, “thrust versus burn time” and “pressure versus burn time,” both generated by the rocket motor during the burn. While thrust and pressure are important parameters in the design of a rocket motor, total impulse is the quantity that incorporates the crucial element of time, measuring how high a rocket can be launched. To ensure greater metrological reliability in static tests of rocket motors, it is important to carefully evaluate the uncertainty levels in the measurement chain of the data acquisition system. This work aims to assess the uncertainty levels expressed in the calculated total impulse values during a static firing test of a rocket motor at the Propulsion Jets Testing Laboratory of the Brazilian Army Technological Center. To estimate the measurement uncertainty of the chain in question, approaches based on combined and expanded uncertainty theories were adopted. These methodologies consider Type A and Type B uncertainties, providing a comprehensive and rigorous analysis. In addition to the uncertainties previously mentioned, the oscillation of the measured signal should also be recognized as a contributing factor to the overall uncertainty in the calculation of total impulse. By incorporating these various sources of uncertainty, we can achieve a more comprehensive and reliable understanding of the uncertainty associated with the measurements obtained from the measurement chain. This analysis yields a measurement uncertainty of 0.24% for thrust and 0.007% for impulse, both calculated at a confidence level of 95.45%.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2025-04-13
DOI
https://doi.org/10.3390/app15084280
Citations
1
Primary Topic
Rocket and propulsion systems research
Type
article
Field-Weighted Citation Impact
4.99

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessing the Metrological Reliability of Static Firing Tests of Rocket Motors Through the Evaluation of Thrust and Total Impulse Measurement Uncertainty

Elcio Cruz de Oliveira, Carlos Roberto Hall Barbosa, Fernando de Paula Leite Castor
1 citations
Applied Sciences
Rocket and propulsion systems research
4.99
article

Assessing the Metrological Reliability of Static Firing Tests of Rocket Motors Through the Evaluation of Thrust and Total Impulse Measurement Uncertainty

Elcio Cruz de Oliveira, Carlos Roberto Hall Barbosa, Fernando de Paula Leite Castor
article en
1 citations

Abstract

A solid propellant rocket motor is a propulsion system used in missiles and rockets that burns a propellant, typically composed of a mixture of fuel and an oxidizer, to generate the thrust necessary to propel the vehicle. During both the development and quality assurance phases, static firing tests of rocket motors are conducted to verify whether the system requirements meet the product specifications. These tests aim to produce two main types of graphs, “thrust versus burn time” and “pressure versus burn time,” both generated by the rocket motor during the burn. While thrust and pressure are important parameters in the design of a rocket motor, total impulse is the quantity that incorporates the crucial element of time, measuring how high a rocket can be launched. To ensure greater metrological reliability in static tests of rocket motors, it is important to carefully evaluate the uncertainty levels in the measurement chain of the data acquisition system. This work aims to assess the uncertainty levels expressed in the calculated total impulse values during a static firing test of a rocket motor at the Propulsion Jets Testing Laboratory of the Brazilian Army Technological Center. To estimate the measurement uncertainty of the chain in question, approaches based on combined and expanded uncertainty theories were adopted. These methodologies consider Type A and Type B uncertainties, providing a comprehensive and rigorous analysis. In addition to the uncertainties previously mentioned, the oscillation of the measured signal should also be recognized as a contributing factor to the overall uncertainty in the calculation of total impulse. By incorporating these various sources of uncertainty, we can achieve a more comprehensive and reliable understanding of the uncertainty associated with the measurements obtained from the measurement chain. This analysis yields a measurement uncertainty of 0.24% for thrust and 0.007% for impulse, both calculated at a confidence level of 95.45%.

Applied SciencesVol. 15(8)
Pontifícia Universidade Católica do Rio de Janeiro (BR), Petrobras (Brazil) (BR), Instituto de Biologia do Exército (BR)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior, Conselho Nacional de Desenvolvimento Científico e Tecnológico
Openalex Percentile: Top 7%
Rocket and propulsion systems research
4.99
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.