A Method of Solving Hierarchical Program Scheduling Problem with Uncertainty

In this study, we define the program scheduling problem and propose a scheduling method for the problem. The program scheduling problem deals with multiple projects that are interrelated in terms of precedence relationships and resource utilization. This problem is divided into two phases: the program scheduling phase and the project scheduling phase. In the program scheduling phase, we assume a situation where project information is progressively elaborated. Therefore, the start time and the amount of resource allocations for the executable projects are determined dynamically. In the project scheduling phase, the start times of project activities are determined, considering constraints of precedence and resource availability. The availability of resources corresponds to the amount of resources allocated during the program scheduling phase. Our proposed scheduling method divides the target problem into several decision-making problems, such as allocating resources to the project, calculating the project makespan based on the resource allocation, and determining the project start time and processing mode. The numerical experiment shows that our proposed method is effective through several simulations.

Authors

Institutions

Publication Details

Journal
Transactions of the Institute of Systems Control and Information Engineers
Published
2025-01-15
DOI
https://doi.org/10.5687/iscie.38.9
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Method of Solving Hierarchical Program Scheduling Problem with Uncertainty

Daisuke Morita, Haruhiko Suwa
Transactions of the Institute of Systems Control and Information Engineers
Scheduling and Optimization Algorithms
article

A Method of Solving Hierarchical Program Scheduling Problem with Uncertainty

Daisuke Morita, Haruhiko Suwa
article en

Abstract

In this study, we define the program scheduling problem and propose a scheduling method for the problem. The program scheduling problem deals with multiple projects that are interrelated in terms of precedence relationships and resource utilization. This problem is divided into two phases: the program scheduling phase and the project scheduling phase. In the program scheduling phase, we assume a situation where project information is progressively elaborated. Therefore, the start time and the amount of resource allocations for the executable projects are determined dynamically. In the project scheduling phase, the start times of project activities are determined, considering constraints of precedence and resource availability. The availability of resources corresponds to the amount of resources allocated during the program scheduling phase. Our proposed scheduling method divides the target problem into several decision-making problems, such as allocating resources to the project, calculating the project makespan based on the resource allocation, and determining the project start time and processing mode. The numerical experiment shows that our proposed method is effective through several simulations.

Transactions of the Institute of Systems Control and Information EngineersVol. 38(1)
Setsunan University (JP)
Openalex Percentile: Top 90%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Method of Solving Hierarchical Program Scheduling Problem with Uncertainty — Daisuke Morita, Haruhiko Suwa · Transactions of the Institute of Systems Control and Information Engineers (2025) | TGRS Research Map | TGRS