Analisis Penjadwalan Waktu Pekerjaan Pada Proyek Jalan Kawasan Ekonomi Khusus (KEK) Pantoloan Menggunakan Linear Scheduling Method (LSM)

A construction project is a temporary activity with a specific end goal. One of the crucial things in the construction process is work scheduling, this is because it can affect the duration and cost of the project. In the context of scheduling, methods such as Block Charts, S-Curves, Network Diagrams, and Balance Line Diagrams/Linear Scheduling Method (LSM) has been around for a long time, but in its application the scheduling method should be adjusted to the characteristics of the project to avoid losses in development. The LSM method is considered appropriate for work that is repetitive in nature. This research aims at analyzing time scheduling for road projects in the Pantoloan Special Economic Area (SEA), Central Sulawesi, using Linear Scheduling Method (LSM). The purpose of this research is to determine the comparison of scheduling and budget plans between the LSM and project methods existing. Data collection consisting of primary data and secondary data was obtained by direct observation in the field and interviews with related parties. Then a scheduling analysis is carried out with assistance software. From the research results on the scheduling of the Pantoloan KEK Road Section Handling Project in Palu City using the LSM method, the completion time was 47 days. Meanwhile, in the initial planning, a completion time of 60 days was required, so there was a difference of 13 days. The project budget plan using the LSM method obtained IDR 2.321.225.151,01. Meanwhile, the initial project budget plan is Rp. 2,365,900,000.00 so there is a cost difference of Rp. 44.674.849.- By looking at the comparison of time effectiveness, scheduling using the LSM method is more effective and efficient.

Authors

Institutions

Publication Details

Journal
REKONSTRUKSI TADULAKO Civil Engineering Journal on Research and Development
Published
2025-02-28
DOI
https://doi.org/10.22487/renstra.v6i1.683
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Penjadwalan Waktu Pekerjaan Pada Proyek Jalan Kawasan Ekonomi Khusus (KEK) Pantoloan Menggunakan Linear Scheduling Method (LSM)

A. Asnudin, R. Ramlan, P.A. Ganiya
REKONSTRUKSI TADULAKO Civil Engineering Journal on Research and Development
Urban Transport Systems Analysis
article

Analisis Penjadwalan Waktu Pekerjaan Pada Proyek Jalan Kawasan Ekonomi Khusus (KEK) Pantoloan Menggunakan Linear Scheduling Method (LSM)

A. Asnudin, R. Ramlan, P.A. Ganiya
article en

Abstract

A construction project is a temporary activity with a specific end goal. One of the crucial things in the construction process is work scheduling, this is because it can affect the duration and cost of the project. In the context of scheduling, methods such as Block Charts, S-Curves, Network Diagrams, and Balance Line Diagrams/Linear Scheduling Method (LSM) has been around for a long time, but in its application the scheduling method should be adjusted to the characteristics of the project to avoid losses in development. The LSM method is considered appropriate for work that is repetitive in nature. This research aims at analyzing time scheduling for road projects in the Pantoloan Special Economic Area (SEA), Central Sulawesi, using Linear Scheduling Method (LSM). The purpose of this research is to determine the comparison of scheduling and budget plans between the LSM and project methods existing. Data collection consisting of primary data and secondary data was obtained by direct observation in the field and interviews with related parties. Then a scheduling analysis is carried out with assistance software. From the research results on the scheduling of the Pantoloan KEK Road Section Handling Project in Palu City using the LSM method, the completion time was 47 days. Meanwhile, in the initial planning, a completion time of 60 days was required, so there was a difference of 13 days. The project budget plan using the LSM method obtained IDR 2.321.225.151,01. Meanwhile, the initial project budget plan is Rp. 2,365,900,000.00 so there is a cost difference of Rp. 44.674.849.- By looking at the comparison of time effectiveness, scheduling using the LSM method is more effective and efficient.

REKONSTRUKSI TADULAKO Civil Engineering Journal on Research and Development
Tadulako University (ID)
Openalex Percentile: Top 92%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Penjadwalan Waktu Pekerjaan Pada Proyek Jalan Kawasan Ekonomi Khusus (KEK) Pantoloan Menggunakan Linear Scheduling Method (LSM) — A. Asnudin, R. Ramlan, et al. · REKONSTRUKSI TADULAKO Civil Engineering Journal on Research and Development (2025) | TGRS Research Map | TGRS