The Theory and Practice of 5D BIM Model for Construction Project Management
This paper explores 5D BIM for construction project management from a theoretical and practical standpoint. Building information modeling (BIM), which enables designers, engineers, contractors, and other team members to more efficiently cooperate using a single digital model of the building, has changed the construction business. In 5D BIM, the two additional dimensions of time and money further improve the model's functionality by allowing for more precise cost estimating, cost control, and project scheduling. This research looks on the main advantages and difficulties of using 5D BIM in building project management. The research assesses how 5D BIM may boost project efficiency, lower risks, and improve project results through a detailed literature review and case studies. It looks on the main advantages and difficulties of using 5D BIM in building project management. The article discovers the various technologies and software tools available for 5D BIM modeling and reviews their capabilities, benefits, and drawbacks. The paper finishes with a list of suggestions, including training programs, communication protocols, and project management approaches, for successfully using 5D BIM in construction project management. Overall, this research offers insightful information about the theory and application of 5D BIM for construction project management, emphasizing its potential to revolutionize the sector and enhance project results.
Authors
- Mohammed Atiqul Hasan
- Md Masud Rana (ORCID: https://orcid.org/0000-0002-7781-2141)
- M N Hasan (ORCID: https://orcid.org/0009-0000-2269-286X)
- Yeasin Arafat
Institutions
- Hohai University (CN)
- Nantong University (CN)
- Zhengzhou University (CN)
- Southwest Jiaotong University (CN)
Publication Details
- Journal
- European Journal of Theoretical and Applied Sciences
- Published
- 2025-04-08
- DOI
- https://doi.org/10.59324/ejtas.2025.3(2).39
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00