Load Flow Analysis of 132 kV Transmission Line with Optimally Terminated Service Potential Transformer Substations

Most villages in Sub-Saharan Africa still lack electricity, despite numerous initiatives and commissions established to address power demands in developing countries. Renewable energy, rural electrification, and non-conventional substations are currently being employed to tackle the electricity issue. This research explored the penetration level of Service Potential Transformer (SPT) substations to solve the lack of electricity in villages near high-voltage transmission lines. The study analyzed the power flow in the 132 kV Juja-Rabai transmission line using PowerWorld Simulator software and determined the optimal termination points for SPT substations. Cost minimization was used as the objective function. At the same time, the voltage profile of the transmission line, the power demand of households, and the distance of villages from the transmission line served as the research constraints. The findings indicated that seven SPT substations could be installed along the 132 kV Juja-Rabai transmission line to supply electricity to nearby villages. These non-conventional substations would be integrated with the existing conventional substations on the transmission line. The power flow analysis for the line was also conducted.

Authors

Institutions

Publication Details

Journal
Journal of Power, Energy, and Control
Published
2025-04-12
DOI
https://doi.org/10.62777/pec.v2i1.36
Primary Topic
High-Voltage Power Transmission Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Load Flow Analysis of 132 kV Transmission Line with Optimally Terminated Service Potential Transformer Substations

Abraham Nyete, Nicodemus Abungu, Joel Mwithui Kitheka, Peter Musau Moses
Journal of Power, Energy, and Control
High-Voltage Power Transmission Systems
article

Load Flow Analysis of 132 kV Transmission Line with Optimally Terminated Service Potential Transformer Substations

Abraham Nyete, Nicodemus Abungu, Joel Mwithui Kitheka, Peter Musau Moses
article en

Abstract

Most villages in Sub-Saharan Africa still lack electricity, despite numerous initiatives and commissions established to address power demands in developing countries. Renewable energy, rural electrification, and non-conventional substations are currently being employed to tackle the electricity issue. This research explored the penetration level of Service Potential Transformer (SPT) substations to solve the lack of electricity in villages near high-voltage transmission lines. The study analyzed the power flow in the 132 kV Juja-Rabai transmission line using PowerWorld Simulator software and determined the optimal termination points for SPT substations. Cost minimization was used as the objective function. At the same time, the voltage profile of the transmission line, the power demand of households, and the distance of villages from the transmission line served as the research constraints. The findings indicated that seven SPT substations could be installed along the 132 kV Juja-Rabai transmission line to supply electricity to nearby villages. These non-conventional substations would be integrated with the existing conventional substations on the transmission line. The power flow analysis for the line was also conducted.

Journal of Power, Energy, and ControlVol. 2(1)
University of Nairobi (KE), South Eastern Kenya University (KE), Machakos University (KE)
Openalex Percentile: Top 94%
High-Voltage Power Transmission Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.