Archival materials about the opening of Out of town park in the 30s in Samara

The presented work reveals the details of the history of the emergence of the Central Park of Culture and Recreation (Out of town Park) in Samara. Archival documents from the Central State Archive of the Samara region served as the material for this study. The period from 1930 to 1932, from the decision to create the park to its opening, is considered. The work introduces into scientific circulation a new previously unknown document – a diagram of the boundaries of the sites combined to create a park, as well as a number of documents that have not previously been published in professional scientific literature. The discovered documents make it possible to study the history and genesis of the planning structure of the Samara “Out of town Park” with higher accuracy. This is especially true now, on the eve of the planned large-scale reconstruction of the park.

Authors

Institutions

Publication Details

Journal
Gradostroitelʹstvo i arhitektura
Published
2024-12-17
DOI
https://doi.org/10.17673/vestnik.2024.04.20
Citations
1
Primary Topic
Landscape and Cultural Studies
Type
article
Field-Weighted Citation Impact
2.92
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Archival materials about the opening of Out of town park in the 30s in Samara

N. A. Orlova, Ekaterina S. Rozhdestvenskaya, Dmitry Nikolaevich Orlov
1 citations
Gradostroitelʹstvo i arhitektura
Landscape and Cultural Studies
2.92
article

Archival materials about the opening of Out of town park in the 30s in Samara

N. A. Orlova, Ekaterina S. Rozhdestvenskaya, Dmitry Nikolaevich Orlov
article en
1 citations

Abstract

The presented work reveals the details of the history of the emergence of the Central Park of Culture and Recreation (Out of town Park) in Samara. Archival documents from the Central State Archive of the Samara region served as the material for this study. The period from 1930 to 1932, from the decision to create the park to its opening, is considered. The work introduces into scientific circulation a new previously unknown document – a diagram of the boundaries of the sites combined to create a park, as well as a number of documents that have not previously been published in professional scientific literature. The discovered documents make it possible to study the history and genesis of the planning structure of the Samara “Out of town Park” with higher accuracy. This is especially true now, on the eve of the planned large-scale reconstruction of the park.

Gradostroitelʹstvo i arhitekturaVol. 14(4)
Samara State Technical University (RU)
Openalex Percentile: Top 6%
Landscape and Cultural Studies
2.92
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Archival materials about the opening of Out of town park in the 30s in Samara — N. A. Orlova, Ekaterina S. Rozhdestvenskaya, et al. · Gradostroitelʹstvo i arhitektura (2024) | TGRS Research Map | TGRS