Stability evaluation and reinforcement of ultra-high fill embankment slope of GRS

The deformation and instability of embankment slope is one of the common engineering diseases in highway engineering. After the disaster occurs, it is easy to cause huge economic losses and casualties. Therefore, it is of great significance and value to carry out the stability evaluation of embankment slope for improving the quality of engineering and ensuring the safety of con-struction. In view of this, this paper took the super-high fill embankment slope project of the 8th section of Cangrong Expressway in Rongxian County, Guangxi, China as the research object. Firstly, a set of three-level stability evaluating indicator system of super-high fill embankment slope of GRS(granite residual soil) including 1 target layer, 4 criterion layers and 23 indicator layers was proposed, and a qualitative and quantitative evaluating indicator framework was established. Then, GT (Game Theory) was used to combine the sovereignty weight of AHP (Analytic Hierarchy Process) and the objective weight of EWM (Entropy Weight Method) to obtain a more compre-hensive combination weight value. Finally, combined with the indicator framework and the combination weight, the stability of the ultra-high fill embankment slope of the project was evaluated. The results showed that the embankment slope was basically stable, and landslide ac-cidents might occur during the construction process. Therefore, according to the relevant param-eters proposed in the indicator layer, the combined design methods and prevention and control measures of construction anti-slide retaining wall, subgrade cement mixing pile, dynamic com-paction reinforcement and geogrid were put forward from the three aspects of drainage, anti-slide means and soil reinforcement. The above treatment was to improve the short-term anti-sliding ability and long-term stability of the embankment slope under unfavorable conditions. So far, the reinforcement measures have been proved to be effective, and no landslide accident has occurred after the reinforcement is completed. The relevant research results can provide reference for similar projects such as stability evaluation and prevention and control measures of high fill embankment slope.

Authors

Institutions

Publication Details

Journal
Frontiers in Earth Science
Published
2025-04-09
DOI
https://doi.org/10.3389/feart.2025.1587121
Citations
1
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
0.95
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Stability evaluation and reinforcement of ultra-high fill embankment slope of GRS

Chao Ren, Changjun Song, WU Li-jian, Jinkun Yang et al.
1 citations
Frontiers in Earth Science
Geotechnical Engineering and Soil Stabilization
0.95
article

Stability evaluation and reinforcement of ultra-high fill embankment slope of GRS

Chao Ren, Changjun Song, WU Li-jian, Jinkun Yang, Qiang Zhang, Li Peng, Zhijie Han, Hua Fan
article en
1 citations

Abstract

The deformation and instability of embankment slope is one of the common engineering diseases in highway engineering. After the disaster occurs, it is easy to cause huge economic losses and casualties. Therefore, it is of great significance and value to carry out the stability evaluation of embankment slope for improving the quality of engineering and ensuring the safety of con-struction. In view of this, this paper took the super-high fill embankment slope project of the 8th section of Cangrong Expressway in Rongxian County, Guangxi, China as the research object. Firstly, a set of three-level stability evaluating indicator system of super-high fill embankment slope of GRS(granite residual soil) including 1 target layer, 4 criterion layers and 23 indicator layers was proposed, and a qualitative and quantitative evaluating indicator framework was established. Then, GT (Game Theory) was used to combine the sovereignty weight of AHP (Analytic Hierarchy Process) and the objective weight of EWM (Entropy Weight Method) to obtain a more compre-hensive combination weight value. Finally, combined with the indicator framework and the combination weight, the stability of the ultra-high fill embankment slope of the project was evaluated. The results showed that the embankment slope was basically stable, and landslide ac-cidents might occur during the construction process. Therefore, according to the relevant param-eters proposed in the indicator layer, the combined design methods and prevention and control measures of construction anti-slide retaining wall, subgrade cement mixing pile, dynamic com-paction reinforcement and geogrid were put forward from the three aspects of drainage, anti-slide means and soil reinforcement. The above treatment was to improve the short-term anti-sliding ability and long-term stability of the embankment slope under unfavorable conditions. So far, the reinforcement measures have been proved to be effective, and no landslide accident has occurred after the reinforcement is completed. The relevant research results can provide reference for similar projects such as stability evaluation and prevention and control measures of high fill embankment slope.

Frontiers in Earth ScienceVol. 13
CCCC Highway Consultants (China) (CN), Ministry of Transport (CN), Research Institute of Highway (CN), Shanxi Transportation Research Institute (CN)
Openalex Percentile: Top 27%
Geotechnical Engineering and Soil Stabilization
0.95
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.