PENENTUAN KEBUTUHAN TENAGA KERJA MANUAL HANDLING DENGAN METODE FULL TIME EQUIVALENT (FTE) PADA LINI PRODUKSI PILUS

The fluctuation and uncertainty of the food industry market demand causes the company to maintain its productivity to be able to meet existing demand. This is also always pursued by PT XYZ as a food and beverage company. In Pilus production process, in addition to using machinery, there is still a lot of manual handling work done. Workload between jobs that cannot cause work to be completed properly, considering that humans are a factor that affects company productivity. Workload calculations are carried out using the Full Time Equivalent (FTE) method to determine the optimal number of workers. From the results of workload calculations on 42 work elements, there are 4 work elements that are overloaded and 38 other work elements are underloaded. After adjusting the workforce composition using the FTE index, it can reduce 4 workers, from 78 workers to 74 workers with a more balanced workload. The results of this study can be used as a consideration in the preparation of labor requirements and are expected to increase the productivity of Pilus production in the company.

Authors

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Industri
Published
2025-04-09
DOI
https://doi.org/10.24912/jitiuntar.v12i3.32262
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PENENTUAN KEBUTUHAN TENAGA KERJA MANUAL HANDLING DENGAN METODE FULL TIME EQUIVALENT (FTE) PADA LINI PRODUKSI PILUS

Indro Prakoso, Akasa Huaida
Jurnal Ilmiah Teknik Industri
Management and Optimization Techniques
article

PENENTUAN KEBUTUHAN TENAGA KERJA MANUAL HANDLING DENGAN METODE FULL TIME EQUIVALENT (FTE) PADA LINI PRODUKSI PILUS

Indro Prakoso, Akasa Huaida
article en

Abstract

The fluctuation and uncertainty of the food industry market demand causes the company to maintain its productivity to be able to meet existing demand. This is also always pursued by PT XYZ as a food and beverage company. In Pilus production process, in addition to using machinery, there is still a lot of manual handling work done. Workload between jobs that cannot cause work to be completed properly, considering that humans are a factor that affects company productivity. Workload calculations are carried out using the Full Time Equivalent (FTE) method to determine the optimal number of workers. From the results of workload calculations on 42 work elements, there are 4 work elements that are overloaded and 38 other work elements are underloaded. After adjusting the workforce composition using the FTE index, it can reduce 4 workers, from 78 workers to 74 workers with a more balanced workload. The results of this study can be used as a consideration in the preparation of labor requirements and are expected to increase the productivity of Pilus production in the company.

Jurnal Ilmiah Teknik IndustriVol. 12(3)
Jenderal Soedirman University (ID)
Openalex Percentile: Top 90%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

PENENTUAN KEBUTUHAN TENAGA KERJA MANUAL HANDLING DENGAN METODE FULL TIME EQUIVALENT (FTE) PADA LINI PRODUKSI PILUS — Indro Prakoso, Akasa Huaida · Jurnal Ilmiah Teknik Industri (2025) | TGRS Research Map | TGRS