ENHANCING SPARE PARTS SALES BY IMPROVED CUSTOMER SERVICE LEVELS MEASURED BY OTIF (ON-TIME IN-FULL) THROUGH NEW SUPPORT POINTS AND SUPPLY CHAIN DISTRIBUTION DESIGN: A CASE STUDY AT PT XYZ MEDAN BRANCH

It was found that there are no support points at PT XYZ's Martabe Site, which led to a problem with customer service levels measured by OTIF (On-Time In-Full). This situation may delay delivery due to the long distance (367 km or 12 hours by land transportation) between Medan and Martabe. Low OTIF rates correspond with the limited availability of parts at PT XYZ. A company's ability to supply demand with its stock is the availability of parts. Consequently, customers purchase from competitors with parts that are ready on-site. This study has designed new support points based on accurate demand forecasting and a project feasibility assessment based on an Internal Rate of Return (IRR). As a result, new support points guaranteed the availability of parts to make the item In-Full and decrease lead time delivery to make the item On-Time. After building a new support point at the Martabe site, sales increased by 74% and contributed to a 44% growth in sales in the Medan area

Authors

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Industri
Published
2025-04-09
DOI
https://doi.org/10.24912/jitiuntar.v12i3.32777
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ENHANCING SPARE PARTS SALES BY IMPROVED CUSTOMER SERVICE LEVELS MEASURED BY OTIF (ON-TIME IN-FULL) THROUGH NEW SUPPORT POINTS AND SUPPLY CHAIN DISTRIBUTION DESIGN: A CASE STUDY AT PT XYZ MEDAN BRANCH

Henry Nasution, Togar Wiliater Soaloon Panjaitan, Edwin Sandjaja
Jurnal Ilmiah Teknik Industri
Management and Optimization Techniques
article

ENHANCING SPARE PARTS SALES BY IMPROVED CUSTOMER SERVICE LEVELS MEASURED BY OTIF (ON-TIME IN-FULL) THROUGH NEW SUPPORT POINTS AND SUPPLY CHAIN DISTRIBUTION DESIGN: A CASE STUDY AT PT XYZ MEDAN BRANCH

Henry Nasution, Togar Wiliater Soaloon Panjaitan, Edwin Sandjaja
article en

Abstract

It was found that there are no support points at PT XYZ's Martabe Site, which led to a problem with customer service levels measured by OTIF (On-Time In-Full). This situation may delay delivery due to the long distance (367 km or 12 hours by land transportation) between Medan and Martabe. Low OTIF rates correspond with the limited availability of parts at PT XYZ. A company's ability to supply demand with its stock is the availability of parts. Consequently, customers purchase from competitors with parts that are ready on-site. This study has designed new support points based on accurate demand forecasting and a project feasibility assessment based on an Internal Rate of Return (IRR). As a result, new support points guaranteed the availability of parts to make the item In-Full and decrease lead time delivery to make the item On-Time. After building a new support point at the Martabe site, sales increased by 74% and contributed to a 44% growth in sales in the Medan area

Jurnal Ilmiah Teknik IndustriVol. 12(3)
Swiss German University (ID), Petra Christian University (ID)
Openalex Percentile: Top 90%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.