PERANCANGAN ULANG TATA LETAK FASILITAS UNTUK MEMINIMALISIR BIAYA MATERIAL HANDLING PADA STUDI KASUS UMKM KONVEKSI ABC

Poor facility layout is a waste that must be minimized. The layout of MSME Konveksi ABC was studied to reduce OMH (Material Handling Cost) expenses. The messy arrangement of production layouts causes less optimization of the flow of the production process, the occurrence of queues when entering and exiting the production floor, and waste of movement time. This research uses the activity relationship chart (ARC) and activity relationship diagram (ARD) methods to help design efficient and effective layouts by paying attention to the sequence and relationship between production activities. The data used is primary data from conducting interviews with MSME owners. The results of the interview show the need for proposed layout changes with the consideration that each absolute activity needs to be brought closer to its production location, the entry and exit points of the production process are designed separately so that there are no accumulations or obstacles if there are employees who want to enter and will leave simultaneously. The results of the proposed layout show the difference in OMH (Material Handling Costs) between the two existing layouts of Rp 3,341,056.8 so, the proposed layout recommended by researchers to MSME Konveksi ABC provides savings in OMH (Material Handling Costs) expenses and optimizes layouts related to worker effectiveness and efficiency.

Authors

Institutions

Publication Details

Journal
Jurnal Ilmiah Teknik Industri
Published
2025-04-09
DOI
https://doi.org/10.24912/jitiuntar.v12i3.28251
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PERANCANGAN ULANG TATA LETAK FASILITAS UNTUK MEMINIMALISIR BIAYA MATERIAL HANDLING PADA STUDI KASUS UMKM KONVEKSI ABC

Syiera Anggita, Hari Purnomo
Jurnal Ilmiah Teknik Industri
Management and Optimization Techniques
article

PERANCANGAN ULANG TATA LETAK FASILITAS UNTUK MEMINIMALISIR BIAYA MATERIAL HANDLING PADA STUDI KASUS UMKM KONVEKSI ABC

Syiera Anggita, Hari Purnomo
article en

Abstract

Poor facility layout is a waste that must be minimized. The layout of MSME Konveksi ABC was studied to reduce OMH (Material Handling Cost) expenses. The messy arrangement of production layouts causes less optimization of the flow of the production process, the occurrence of queues when entering and exiting the production floor, and waste of movement time. This research uses the activity relationship chart (ARC) and activity relationship diagram (ARD) methods to help design efficient and effective layouts by paying attention to the sequence and relationship between production activities. The data used is primary data from conducting interviews with MSME owners. The results of the interview show the need for proposed layout changes with the consideration that each absolute activity needs to be brought closer to its production location, the entry and exit points of the production process are designed separately so that there are no accumulations or obstacles if there are employees who want to enter and will leave simultaneously. The results of the proposed layout show the difference in OMH (Material Handling Costs) between the two existing layouts of Rp 3,341,056.8 so, the proposed layout recommended by researchers to MSME Konveksi ABC provides savings in OMH (Material Handling Costs) expenses and optimizes layouts related to worker effectiveness and efficiency.

Jurnal Ilmiah Teknik IndustriVol. 12(3)
Islamic University of Indonesia (ID)
Openalex Percentile: Top 90%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

PERANCANGAN ULANG TATA LETAK FASILITAS UNTUK MEMINIMALISIR BIAYA MATERIAL HANDLING PADA STUDI KASUS UMKM KONVEKSI ABC — Syiera Anggita, Hari Purnomo · Jurnal Ilmiah Teknik Industri (2025) | TGRS Research Map | TGRS