Qualitative system dynamics approach to modelling cost escalation determinants in Nigerian public sector projects

Purpose Cost escalation has been identified as one of the most significant challenges and recurring issues in the delivery of social and economic infrastructure in the Nigerian public sector. Like many other countries in the Global South, the Nigerian public sector projects suffer from poor cost performance. Thus, this study aims to analyse the dynamics of construction cost escalation determinants and produced a conceptual system dynamic model that captures the intricate interactions among these determinants. Design/methodology/approach This study includes a literature review and qualitative approach using semi-structured interviews. Data were obtained from 17 stakeholders involved in the delivery of Nigeria public sector projects, including Project managers, Architects, Civil engineer, Quantity surveyors and Construction managers. The data were analysed using a coding framework informed by case study approach, the principles of thematic analysis and saliency analysis framework, enabling the modelling of intricate interactions among various determinants of cost escalation. Findings The findings revealed a complex and dynamic interaction among the determinants, indicating that an isolated solution to cost escalation, particularly in developing countries like Nigeria, is unlikely. Instead, a holistic, system-oriented approach that considers the interplay of multiple determinants is necessary for effective cost escalation management. One of the determinants identified was the lack of technical competence among professionals involved in the delivery of public sector construction projects. In addition, the analysis of the causal loop diagram revealed intervention points in the project delivery process to counter cost escalation. This study postulates that a key intervention strategy involves enhancing the competencies of construction professionals through synergistic collaboration between various stakeholders: public sector entities, professional bodies, statutory regulatory bodies and policymakers. Research limitations/implications As the findings are rooted in Nigerian public construction projects, their relevance to privately financed projects might be limited. Also, the study focuses solely on the construction stage, without extending to the post-construction phase. Furthermore, the themes and their causal links were derived from viewpoints of experts from the Nigerian context. Future studies could enhance the external validity of the research results by examining their applicability in other contexts and by integrating the later phases of public sector construction projects, such as facilities management operation, to offer a more holistic view of the problem. Originality/value This study presents a collaborative and holistic approach to address cost escalation in Nigerian public sector projects by modelling the complex interactions among various determinants influencing cost escalation within a dynamic framework and identifying critical intervention points in the project delivery process.

Authors

Institutions

Publication Details

Journal
Journal of Facilities Management
Published
2025-04-08
DOI
https://doi.org/10.1108/jfm-07-2024-0085
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Qualitative system dynamics approach to modelling cost escalation determinants in Nigerian public sector projects

Bismark Aha, Ayokunle Olubunmi Olanipekun, Sa’id Ahmed, Abba Tahir Mahmud et al.
Journal of Facilities Management
Construction Project Management and Performance
article

Qualitative system dynamics approach to modelling cost escalation determinants in Nigerian public sector projects

Bismark Aha, Ayokunle Olubunmi Olanipekun, Sa’id Ahmed, Abba Tahir Mahmud, Sani Reuben Akoh
article en

Abstract

Purpose Cost escalation has been identified as one of the most significant challenges and recurring issues in the delivery of social and economic infrastructure in the Nigerian public sector. Like many other countries in the Global South, the Nigerian public sector projects suffer from poor cost performance. Thus, this study aims to analyse the dynamics of construction cost escalation determinants and produced a conceptual system dynamic model that captures the intricate interactions among these determinants. Design/methodology/approach This study includes a literature review and qualitative approach using semi-structured interviews. Data were obtained from 17 stakeholders involved in the delivery of Nigeria public sector projects, including Project managers, Architects, Civil engineer, Quantity surveyors and Construction managers. The data were analysed using a coding framework informed by case study approach, the principles of thematic analysis and saliency analysis framework, enabling the modelling of intricate interactions among various determinants of cost escalation. Findings The findings revealed a complex and dynamic interaction among the determinants, indicating that an isolated solution to cost escalation, particularly in developing countries like Nigeria, is unlikely. Instead, a holistic, system-oriented approach that considers the interplay of multiple determinants is necessary for effective cost escalation management. One of the determinants identified was the lack of technical competence among professionals involved in the delivery of public sector construction projects. In addition, the analysis of the causal loop diagram revealed intervention points in the project delivery process to counter cost escalation. This study postulates that a key intervention strategy involves enhancing the competencies of construction professionals through synergistic collaboration between various stakeholders: public sector entities, professional bodies, statutory regulatory bodies and policymakers. Research limitations/implications As the findings are rooted in Nigerian public construction projects, their relevance to privately financed projects might be limited. Also, the study focuses solely on the construction stage, without extending to the post-construction phase. Furthermore, the themes and their causal links were derived from viewpoints of experts from the Nigerian context. Future studies could enhance the external validity of the research results by examining their applicability in other contexts and by integrating the later phases of public sector construction projects, such as facilities management operation, to offer a more holistic view of the problem. Originality/value This study presents a collaborative and holistic approach to address cost escalation in Nigerian public sector projects by modelling the complex interactions among various determinants influencing cost escalation within a dynamic framework and identifying critical intervention points in the project delivery process.

Journal of Facilities ManagementVol. 24(1)
Kingston University London (GB), Kingston University (US), Nottingham Trent University (GB), University of Salford (GB), University of Portsmouth (GB)
Openalex Percentile: Top 92%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.