Optimization of Inbound Logistics of Automobile Industry Using Flexsim

This study focuses on optimizing inbound logistics in the automobile industry by exploring how Flex Sim software can enhance productivity in car coating and assembly processes. By evaluating both separate and integrated production setups, the study demonstrates significant gains in operational efficiency and productivity. In a setup with separate plants, producing 500 automobiles requires 73.38 hours, with an average machine efficiency of 73.24% and a yield ratio of 98.62%. Conversely, integrating coating and assembly processes in a combined plant reduces production time to 35 hours and raises machine efficiency to 85.26%, with a slight reduction in the yield ratio to 93.96%. These results suggest that while there is a minor trade-off in yield, integrating processes leads to major improvements in time and efficiency.

Authors

Institutions

Publication Details

Published
2024-12-21
DOI
https://doi.org/10.46254/ba07.20240083
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Inbound Logistics of Automobile Industry Using Flexsim

Akter Mahmud Shihab Mahin, Md Soad Solaiman, Lecturer Basit Mahmud Shahriar
1 links
Advanced Manufacturing and Logistics Optimization
article

Optimization of Inbound Logistics of Automobile Industry Using Flexsim

Akter Mahmud Shihab Mahin, Md Soad Solaiman, Lecturer Basit Mahmud Shahriar
article en

Abstract

This study focuses on optimizing inbound logistics in the automobile industry by exploring how Flex Sim software can enhance productivity in car coating and assembly processes. By evaluating both separate and integrated production setups, the study demonstrates significant gains in operational efficiency and productivity. In a setup with separate plants, producing 500 automobiles requires 73.38 hours, with an average machine efficiency of 73.24% and a yield ratio of 98.62%. Conversely, integrating coating and assembly processes in a combined plant reduces production time to 35 hours and raises machine efficiency to 85.26%, with a slight reduction in the yield ratio to 93.96%. These results suggest that while there is a minor trade-off in yield, integrating processes leads to major improvements in time and efficiency.

Dhaka University of Engineering & Technology (BD)
Openalex Percentile: Top 57%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.