Demand forecasting of Steel industries’ finished product using ARIMA Model: Bangladesh Perspective

The study on demand forecasting is pertinent in countries like Bangladesh where the industry specifically heavy industries are dying for accurate demand forecast. Autoregressive Integrated Moving Average (ARIMA) model has been used to detect patterns, trends and seasonal influences in order to generate accurate short-term forecasts. Data has been collected monthly, ranging from July to June of each corresponding year. Data processing involved zero-value occurrences, time-series decomposition and performed tests of stationarity. SARIMA with Exogenous Model, ARIMA Model for VIX Index on overridden series have been developed and, forecast performance was evaluated. Moreover, prediction range by specifying confidence interval levels has been prepared. It is found a strong monthly seasonal effect of production, with peaks in the first quarter and minimum values in July-August compatible with ideal rain conditions. The start of a slight upward trend in overall production indicated slow sector expansion. The SARIMA model selected had an average forecast accuracy of MAPE=34.84% and RMSE=16,349 MT. The ambiguity reinforces the nuanced set of variables which determine if heavy industries like Steel re-rolling mills in Bangladesh are allowed to produce.

Authors

Institutions

Publication Details

Published
2024-12-21
DOI
https://doi.org/10.46254/ba07.20240269
Primary Topic
Forecasting Techniques and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Demand forecasting of Steel industries’ finished product using ARIMA Model: Bangladesh Perspective

Shipra Banik, M.S. Rabbi, E Karim
Forecasting Techniques and Applications
article

Demand forecasting of Steel industries’ finished product using ARIMA Model: Bangladesh Perspective

Shipra Banik, M.S. Rabbi, E Karim
article en

Abstract

The study on demand forecasting is pertinent in countries like Bangladesh where the industry specifically heavy industries are dying for accurate demand forecast. Autoregressive Integrated Moving Average (ARIMA) model has been used to detect patterns, trends and seasonal influences in order to generate accurate short-term forecasts. Data has been collected monthly, ranging from July to June of each corresponding year. Data processing involved zero-value occurrences, time-series decomposition and performed tests of stationarity. SARIMA with Exogenous Model, ARIMA Model for VIX Index on overridden series have been developed and, forecast performance was evaluated. Moreover, prediction range by specifying confidence interval levels has been prepared. It is found a strong monthly seasonal effect of production, with peaks in the first quarter and minimum values in July-August compatible with ideal rain conditions. The start of a slight upward trend in overall production indicated slow sector expansion. The SARIMA model selected had an average forecast accuracy of MAPE=34.84% and RMSE=16,349 MT. The ambiguity reinforces the nuanced set of variables which determine if heavy industries like Steel re-rolling mills in Bangladesh are allowed to produce.

Chittagong University of Engineering & Technology (BD)
Decent work and economic growth
Openalex Percentile: Top 65%
Forecasting Techniques and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.