Analisis Perbandingan Waktu dan Biaya Kelayakan Penggunaan Material Bata Ringan dan Sandwich PU Panel

Construction projects are unique activities, many factors affect the uniqueness of construction projects, from the type of project, workers, the shape of the building, the budgeted costs to the environment where the construction project is built. The materials applied to construction projects are part of the uniqueness of construction projects that coincide with the environment and the type of project or in other words, the materials used in construction projects are very dependent on the cost and type of project, especially in wall installation, consisting of various materials, one of which is sandwich, PU panels, and light bricks. The application of materials also needs to be considered in the construction project that will be built, one example is the construction of a commercial broiler farm. This study aims to determine the comparison of time, cost, and difference in NPV value in wall installation using PU panel sandwich material and light brick in the construction of a commercial broiler farm in Wuryantoro, Wonogiri Regency, Central Java. Based on the results of the analysis, it was found that the time for wall installation with PU panel sandwich was 15 days, while the installation of walls with light bricks was 21 days for each building unit. And based on the RAB for the implementation of wall installation work using PU panels amounting to Rp. 666,246,585, and for the RAB for the implementation of wall installation with light brick materials worth Rp. 399,456,831. Meanwhile, for the comparison of NPV projected for 5 years for PU Panel is Rp. 244,981,275, while for light brick work it is Rp. 517,436,965. So that the difference in NPV between the two materials is Rp. 272,455,689.

Authors

Institutions

Publication Details

Journal
Jurnal Penelitian Rumpun Ilmu Teknik
Published
2024-09-21
DOI
https://doi.org/10.55606/juprit.v3i4.4306
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Perbandingan Waktu dan Biaya Kelayakan Penggunaan Material Bata Ringan dan Sandwich PU Panel

Iwan Christianto
Jurnal Penelitian Rumpun Ilmu Teknik
Management and Optimization Techniques
article

Analisis Perbandingan Waktu dan Biaya Kelayakan Penggunaan Material Bata Ringan dan Sandwich PU Panel

Iwan Christianto
article en

Abstract

Construction projects are unique activities, many factors affect the uniqueness of construction projects, from the type of project, workers, the shape of the building, the budgeted costs to the environment where the construction project is built. The materials applied to construction projects are part of the uniqueness of construction projects that coincide with the environment and the type of project or in other words, the materials used in construction projects are very dependent on the cost and type of project, especially in wall installation, consisting of various materials, one of which is sandwich, PU panels, and light bricks. The application of materials also needs to be considered in the construction project that will be built, one example is the construction of a commercial broiler farm. This study aims to determine the comparison of time, cost, and difference in NPV value in wall installation using PU panel sandwich material and light brick in the construction of a commercial broiler farm in Wuryantoro, Wonogiri Regency, Central Java. Based on the results of the analysis, it was found that the time for wall installation with PU panel sandwich was 15 days, while the installation of walls with light bricks was 21 days for each building unit. And based on the RAB for the implementation of wall installation work using PU panels amounting to Rp. 666,246,585, and for the RAB for the implementation of wall installation with light brick materials worth Rp. 399,456,831. Meanwhile, for the comparison of NPV projected for 5 years for PU Panel is Rp. 244,981,275, while for light brick work it is Rp. 517,436,965. So that the difference in NPV between the two materials is Rp. 272,455,689.

Jurnal Penelitian Rumpun Ilmu TeknikVol. 3(4)
Islamic University of Indonesia (ID)
Openalex Percentile: Top 51%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Perbandingan Waktu dan Biaya Kelayakan Penggunaan Material Bata Ringan dan Sandwich PU Panel — Iwan Christianto · Jurnal Penelitian Rumpun Ilmu Teknik (2024) | TGRS Research Map | TGRS