Explainable Machine Learning to Predict the Construction Cost of Power Plant Based on Random Forest and Shapley Method

This study aims to develop a reliable method for predicting power plant construction costs during the early planning stages using ensemble machine learning techniques. Accurate cost predictions are essential for project feasibility, and this research highlights the strength of ensemble methods in improving prediction accuracy by combining the advantages of multiple models, offering a significant improvement over traditional approaches. This investigation employed the Random Forest (RF) algorithm to estimate the overall construction cost of a power plant. The RF algorithm was contrasted with single-learner machine learning models: Support Vector Regression (SVR) and k-Nearest Neighbors (KNN). Performance measures, comprising the coefficient of determination (R2), Mean Absolute Error (MAE), and Root Mean Squared Error (RMSE), were used to evaluate and contrast the performance of the implemented models. Statistical measures demonstrated that the RF approach surpassed alternative models, demonstrating the highest coefficient of determination for testing (R2=0.956) and the lowest Root Mean Square Error (RMSE = 29.27) for the testing dataset. The Shapley Additive Explanation (SHAP) technique was implemented to explain the significance and impact of predictor factors affecting power plant construction costs. The outcomes of this investigation provide crucial information for project decision-makers, allowing them to reduce discrepancies in projected costs and make informed decisions at the beginning of the construction phase.

Authors

Institutions

Publication Details

Journal
CivilEng
Published
2025-04-05
DOI
https://doi.org/10.3390/civileng6020021
Citations
4
Primary Topic
Traffic Prediction and Management Techniques
Type
article
Field-Weighted Citation Impact
4.03

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Explainable Machine Learning to Predict the Construction Cost of Power Plant Based on Random Forest and Shapley Method

Luís Filipe Almeida Bernardo, M. A. Ahmed, Hamza Imran, Hugo Alexandre Silva Pinto et al.
4 citations
CivilEng
Traffic Prediction and Management Techniques
4.03
article

Explainable Machine Learning to Predict the Construction Cost of Power Plant Based on Random Forest and Shapley Method

Luís Filipe Almeida Bernardo, M. A. Ahmed, Hamza Imran, Hugo Alexandre Silva Pinto, Suha Falih Mahdi Alazawy, Saja Hadi Raheem
article en
4 citations

Abstract

This study aims to develop a reliable method for predicting power plant construction costs during the early planning stages using ensemble machine learning techniques. Accurate cost predictions are essential for project feasibility, and this research highlights the strength of ensemble methods in improving prediction accuracy by combining the advantages of multiple models, offering a significant improvement over traditional approaches. This investigation employed the Random Forest (RF) algorithm to estimate the overall construction cost of a power plant. The RF algorithm was contrasted with single-learner machine learning models: Support Vector Regression (SVR) and k-Nearest Neighbors (KNN). Performance measures, comprising the coefficient of determination (R2), Mean Absolute Error (MAE), and Root Mean Squared Error (RMSE), were used to evaluate and contrast the performance of the implemented models. Statistical measures demonstrated that the RF approach surpassed alternative models, demonstrating the highest coefficient of determination for testing (R2=0.956) and the lowest Root Mean Square Error (RMSE = 29.27) for the testing dataset. The Shapley Additive Explanation (SHAP) technique was implemented to explain the significance and impact of predictor factors affecting power plant construction costs. The outcomes of this investigation provide crucial information for project decision-makers, allowing them to reduce discrepancies in projected costs and make informed decisions at the beginning of the construction phase.

CivilEngVol. 6(2)
University of Beira Interior (PT), Iraqi University (IQ), Al-Furat Al-Awsat Technical University (IQ), University of Diyala (IQ)
Ministério da Ciência, Tecnologia e Ensino Superior, Fundação para a Ciência e a Tecnologia
Openalex Percentile: Top 7%
Traffic Prediction and Management Techniques
4.03
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.