Roof Collapse of a Large Retail Building

On a rainy morning just before opening, a large section of roof collapsed onto the checkout stands in a large retail store. Had the collapse occurred when the store was open, numerous people would have been injured. The building sat vacant for several years before it was purchased and renovated. As part of the renovation, the building was reroofed, which included replacement of over 100 sheets of decayed or damaged plywood roof sheathing. Third party inspectors were present during the sheathing replacement and reroofing. Aerial images showed that after the reroofing, a low spot formed over the collapse area and got larger within a few years. On site investigation after the collapse showed that the top laminations of the glulam beam supporting the collapsed area was heavily decayed. New roof sheathing had been nailed into the decayed portions of this glulam beam. Investigation of areas beyond the collapse found significant decay of other roof framing elements. Besides reconstructing the collapsed portion of the roof, the remaining roof framing had to be strengthened because of this decay. The case study calls into question the lack of adequate investigation into the existing condition of the roof framing system prior to and after the purchase of the building, as well as during subsequent renovation work. Decayed joists and beams were not directly visible from above because of the roof sheathing, and not directly visible from below because of the ceiling tiles and the roof insulation, which was sandwiched between the roof joists. Still, the fact that over 100 sheets of plywood sheathing had to be replaced because of decay and damage, and that there were visible signs of numerous leaks in the roof, should have caused the owner and its consultants to further investigate the condition of the roof framing. Had that been done, and the decay in the glulam beam been addressed, the collapse would not have occurred.

Authors

Institutions

Publication Details

Published
2025-04-07
DOI
https://doi.org/10.1061/9780784486085.027
Primary Topic
Structural Response to Dynamic Loads
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Roof Collapse of a Large Retail Building

Kent K. Sasaki, Veronica G. Timpane
Structural Response to Dynamic Loads
article

Roof Collapse of a Large Retail Building

Kent K. Sasaki, Veronica G. Timpane
article en

Abstract

On a rainy morning just before opening, a large section of roof collapsed onto the checkout stands in a large retail store. Had the collapse occurred when the store was open, numerous people would have been injured. The building sat vacant for several years before it was purchased and renovated. As part of the renovation, the building was reroofed, which included replacement of over 100 sheets of decayed or damaged plywood roof sheathing. Third party inspectors were present during the sheathing replacement and reroofing. Aerial images showed that after the reroofing, a low spot formed over the collapse area and got larger within a few years. On site investigation after the collapse showed that the top laminations of the glulam beam supporting the collapsed area was heavily decayed. New roof sheathing had been nailed into the decayed portions of this glulam beam. Investigation of areas beyond the collapse found significant decay of other roof framing elements. Besides reconstructing the collapsed portion of the roof, the remaining roof framing had to be strengthened because of this decay. The case study calls into question the lack of adequate investigation into the existing condition of the roof framing system prior to and after the purchase of the building, as well as during subsequent renovation work. Decayed joists and beams were not directly visible from above because of the roof sheathing, and not directly visible from below because of the ceiling tiles and the roof insulation, which was sandwiched between the roof joists. Still, the fact that over 100 sheets of plywood sheathing had to be replaced because of decay and damage, and that there were visible signs of numerous leaks in the roof, should have caused the owner and its consultants to further investigate the condition of the roof framing. Had that been done, and the decay in the glulam beam been addressed, the collapse would not have occurred.

Wiss Janney Elstner Associates (US)
Sustainable cities and communities
Openalex Percentile: Top 93%
Structural Response to Dynamic Loads
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.