Survey for Open Shop Scheduling

In the Open Shop Scheduling, a group of jobs are assigned to several machines, and each job can be handled on any machine without following a set order. The main difficulty is figuring out the best scheduling configuration to reduce the makespan or the amount of time needed to finish all jobs from the beginning of the first work to the end of the last. Multiple jobs requiring the same machine simultaneously can cause scheduling conflicts, which must be avoided while considering work order flexibility among different machines. Scheduling considerations in OSS are extremely complicated because every job must be executed on every machine exactly once. The goal is to determine an efficient sequence that balances the workload across available machines, minimizing makespan while adhering to various operational constraints. This survey provides a comprehensive analysis of Open Shop Scheduling, a widely studied topic in scientific research focusing on minimizing makespan, synthesizes key contributions from the literature, highlights recent advancements, and outlines potential avenues for future research.

Authors

Institutions

Publication Details

Journal
Journal of Al-Qadisiyah for Computer Science and Mathematics
Published
2025-03-30
DOI
https://doi.org/10.29304/jqcsm.2025.17.11965
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Survey for Open Shop Scheduling

Tabark Nameer Abd Ali, Luma S. Hasan
Journal of Al-Qadisiyah for Computer Science and Mathematics
Advanced Manufacturing and Logistics Optimization
article

Survey for Open Shop Scheduling

Tabark Nameer Abd Ali, Luma S. Hasan
article en

Abstract

In the Open Shop Scheduling, a group of jobs are assigned to several machines, and each job can be handled on any machine without following a set order. The main difficulty is figuring out the best scheduling configuration to reduce the makespan or the amount of time needed to finish all jobs from the beginning of the first work to the end of the last. Multiple jobs requiring the same machine simultaneously can cause scheduling conflicts, which must be avoided while considering work order flexibility among different machines. Scheduling considerations in OSS are extremely complicated because every job must be executed on every machine exactly once. The goal is to determine an efficient sequence that balances the workload across available machines, minimizing makespan while adhering to various operational constraints. This survey provides a comprehensive analysis of Open Shop Scheduling, a widely studied topic in scientific research focusing on minimizing makespan, synthesizes key contributions from the literature, highlights recent advancements, and outlines potential avenues for future research.

Journal of Al-Qadisiyah for Computer Science and MathematicsVol. 17(1)
University of Al-Qadisiyah (IQ)
Openalex Percentile: Top 91%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.