Challenges of PV Grid Synchronization: A Case Study of Bangweulu Solar Plant and CEC Solar Plant in Zambia
Grid synchronization of photovoltaic (PV) systems is critical for ensuring stable and reliable power delivery, especially in regions with growing renewable energy adoption. This paper examines the challenges faced by the Bangweulu Solar Plant and the Copperbelt Energy Company (CEC) Solar Plant in Zambia, highlighting key synchronization issues that hinder optimal grid integration. Through detailed analysis, the study identifies factors such as grid instability, power quality disturbances, and varying load demands as primary challenges. Advanced monitoring tools and data-driven insights are used to evaluate the impact of these challenges on system performance and compliance with grid codes. Additionally, the paper explores potential mitigation strategies, including advanced control techniques and infrastructure upgrades, tailored to the local context. The findings aim to inform stakeholders and contribute to the broader discourse on enhancing PV grid integration in sub-Saharan Africa.
Authors
- Francis Kafata
- Ebert Mwala
Publication Details
- Journal
- International Journal For Multidisciplinary Research
- Published
- 2025-04-03
- DOI
- https://doi.org/10.36948/ijfmr.2025.v07i02.40175
- Primary Topic
- Microgrid Control and Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00