Analysis of Quality Improvement of Wood Powder Raw Materials at CV. NKM Using FMEA and FTA Methods

CV. NKM is a supplier company that takes manufacturing plant waste in the form of sawdust, especially waste from merbau wood, sent to factories whose main raw material is sawdust such as pallet factories, briquettes, etc. In every process there are defects such as powder mixed with other sizes, smelly and moldy powder, and wet powder. In every process there are defects such as powder mixed with other sizes, smelly and moldy powder, and wet powder. These defects are due to human factors, tools/machines, storage, etc. So this research was conducted using the FMEA (Failure Mode and Effect) method used to determine the severity, occurrence, and detection levels, so that the highest RPN value of 576 was obtained, namely powder mixed with other sizes and FTA produced basic events from the highest RPN value, namely lack of rest hours, lack of supervision, and lack of routine control. After the results are known, an improvement proposal will be given for the highest RPN value, namely providing sufficient hours of rest and enforcing routine control of the tool/machine.

Authors

Institutions

Publication Details

Journal
Jurnal Teknologi Terapan G-Tech
Published
2025-04-02
DOI
https://doi.org/10.70609/gtech.v9i2.6537
Citations
1
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
1.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Quality Improvement of Wood Powder Raw Materials at CV. NKM Using FMEA and FTA Methods

Hidayat Hidayat, Deny Andesta, Muhammad Fairuz Baad
1 citations
Jurnal Teknologi Terapan G-Tech
Manufacturing Process and Optimization
1.24
article

Analysis of Quality Improvement of Wood Powder Raw Materials at CV. NKM Using FMEA and FTA Methods

Hidayat Hidayat, Deny Andesta, Muhammad Fairuz Baad
article en
1 citations

Abstract

CV. NKM is a supplier company that takes manufacturing plant waste in the form of sawdust, especially waste from merbau wood, sent to factories whose main raw material is sawdust such as pallet factories, briquettes, etc. In every process there are defects such as powder mixed with other sizes, smelly and moldy powder, and wet powder. In every process there are defects such as powder mixed with other sizes, smelly and moldy powder, and wet powder. These defects are due to human factors, tools/machines, storage, etc. So this research was conducted using the FMEA (Failure Mode and Effect) method used to determine the severity, occurrence, and detection levels, so that the highest RPN value of 576 was obtained, namely powder mixed with other sizes and FTA produced basic events from the highest RPN value, namely lack of rest hours, lack of supervision, and lack of routine control. After the results are known, an improvement proposal will be given for the highest RPN value, namely providing sufficient hours of rest and enforcing routine control of the tool/machine.

Jurnal Teknologi Terapan G-TechVol. 9(2)
Universitas Muhammadiyah Gresik (ID)
Openalex Percentile: Top 21%
Manufacturing Process and Optimization
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.