Temperature Field Determination during Bridge Pier Construction

Thermal deformation resulting from the hydration of cement in the concrete mix is a primary cause of thermal cracking in structures, particularly in mass concrete elements, and more specifically in the abutments and piers of bridges. These cracks are most likely to occur at an early age, when the temperature rise within the concrete is most pronounced. The formation of thermal cracks is especially problematic in the early stages of construction, as the temperature differential between the interior and surface of the structure can lead to significant stresses. Therefore, understanding the temperature and stress fields during the construction of bridge piers is crucial for identifying effective strategies to mitigate thermal cracking. This paper investigates the underlying causes of thermal crack formation in bridge piers and applies the Finite Element Method (FEM) to analyze the temperature field during the construction process under typical Vietnamese conditions. The findings of this study aim to provide practical solutions for preventing thermal cracking in bridge pier structures during the construction phase, ensuring the durability and integrity of the bridge over time.

Authors

Publication Details

Journal
Engineering Technology & Applied Science Research
Published
2025-04-03
DOI
https://doi.org/10.48084/etasr.9265
Primary Topic
Concrete Corrosion and Durability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Temperature Field Determination during Bridge Pier Construction

Trong Chuc Nguyen, B.T. Phung
Engineering Technology & Applied Science Research
Concrete Corrosion and Durability
article

Temperature Field Determination during Bridge Pier Construction

Trong Chuc Nguyen, B.T. Phung
article en

Abstract

Thermal deformation resulting from the hydration of cement in the concrete mix is a primary cause of thermal cracking in structures, particularly in mass concrete elements, and more specifically in the abutments and piers of bridges. These cracks are most likely to occur at an early age, when the temperature rise within the concrete is most pronounced. The formation of thermal cracks is especially problematic in the early stages of construction, as the temperature differential between the interior and surface of the structure can lead to significant stresses. Therefore, understanding the temperature and stress fields during the construction of bridge piers is crucial for identifying effective strategies to mitigate thermal cracking. This paper investigates the underlying causes of thermal crack formation in bridge piers and applies the Finite Element Method (FEM) to analyze the temperature field during the construction process under typical Vietnamese conditions. The findings of this study aim to provide practical solutions for preventing thermal cracking in bridge pier structures during the construction phase, ensuring the durability and integrity of the bridge over time.

Engineering Technology & Applied Science ResearchVol. 15(2)
Openalex Percentile: Top 93%
Concrete Corrosion and Durability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Temperature Field Determination during Bridge Pier Construction — Trong Chuc Nguyen, B.T. Phung · Engineering Technology & Applied Science Research (2025) | TGRS Research Map | TGRS