An Audit System Causality Model for Construction Safety Management System Assessment in Building Projects using Integrated Design-Build

Increasing the implementation of Construction Safety Management Systems (CSMSs) has proven to be an effective strategy for preventing construction accidents. Unfortunately, the current safety audit system is still not fully developed at each stage of the project life cycle, especially in integrated design-build contracts for construction projects. Based on this phenomenon, the objectives of the current research were developed, which include identifying the indicators and sub-indicators of the performance assessment audit system, and designing a causality model of the indicators and sub-indicators of the assessment audit system in each project life cycle, especially for the integrated design-build contract. The research method comprises a literature review and expert validation to obtain the indicators and sub-indicators for the safety system audit. In addition, a perception survey was conducted through with questionnaires being distributed to safety engineers and safety personnel in several construction projects. The questionnaire data were analyzed using Structural Equation Modeling (SEM) with Partial Least Squares (PLS) to develop a causality model for the safety indicators and sub-indicators. The study results obtained five indicators and eighty-six sub-indicators in the safety audit system that significantly influenced the performance of safety implementation in construction projects. Moreover, he causality model obtained Y1 = 0.2518X1 - 0.0308X2 - 0.3523X3 + 0.4188X4 - 0.0693X5 including: X1 leadership and worker participation in construction safety, X2 construction safety planning, X3 construction safety support, X4 construction safety operational, and X5 construction safety performance evaluation. The results of this study are expected to act as a reference, especially for service providers implementing the elements of the audit system.

Authors

Institutions

Publication Details

Journal
Engineering Technology & Applied Science Research
Published
2025-04-03
DOI
https://doi.org/10.48084/etasr.9548
Citations
2
Primary Topic
Occupational Health and Safety Research
Type
article
Field-Weighted Citation Impact
3.08
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Audit System Causality Model for Construction Safety Management System Assessment in Building Projects using Integrated Design-Build

Yusuf Latief, Agung Wibowo, Rosmariani Arifuddin, Danang Budi Nugroho et al.
2 citations
Engineering Technology & Applied Science Research
Occupational Health and Safety Research
3.08
article

An Audit System Causality Model for Construction Safety Management System Assessment in Building Projects using Integrated Design-Build

Yusuf Latief, Agung Wibowo, Rosmariani Arifuddin, Danang Budi Nugroho, Muh Rifan Fadlillah, Ahmad Bakir Alfawaid
article en
2 citations

Abstract

Increasing the implementation of Construction Safety Management Systems (CSMSs) has proven to be an effective strategy for preventing construction accidents. Unfortunately, the current safety audit system is still not fully developed at each stage of the project life cycle, especially in integrated design-build contracts for construction projects. Based on this phenomenon, the objectives of the current research were developed, which include identifying the indicators and sub-indicators of the performance assessment audit system, and designing a causality model of the indicators and sub-indicators of the assessment audit system in each project life cycle, especially for the integrated design-build contract. The research method comprises a literature review and expert validation to obtain the indicators and sub-indicators for the safety system audit. In addition, a perception survey was conducted through with questionnaires being distributed to safety engineers and safety personnel in several construction projects. The questionnaire data were analyzed using Structural Equation Modeling (SEM) with Partial Least Squares (PLS) to develop a causality model for the safety indicators and sub-indicators. The study results obtained five indicators and eighty-six sub-indicators in the safety audit system that significantly influenced the performance of safety implementation in construction projects. Moreover, he causality model obtained Y1 = 0.2518X1 - 0.0308X2 - 0.3523X3 + 0.4188X4 - 0.0693X5 including: X1 leadership and worker participation in construction safety, X2 construction safety planning, X3 construction safety support, X4 construction safety operational, and X5 construction safety performance evaluation. The results of this study are expected to act as a reference, especially for service providers implementing the elements of the audit system.

Engineering Technology & Applied Science ResearchVol. 15(2)
Diponegoro University (ID), University of Indonesia (ID), National Nuclear Energy Agency of Indonesia (ID), Hasanuddin University (ID)
Openalex Percentile: Top 11%
Occupational Health and Safety Research
3.08
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.