Bridge construction requires careful planning and in-depth study as no undue risk should be taken in its design and construction. Constructing a bridge across braided river is still a Challenging task. Hydraulic aspects of bridge design mainly consists of selection of site, optimum orientation and waterway, location of abutments, design of guide banks, approach banks, and design of piers.. Hydraulic model studies were carried out at CW&PRS for the Rail and Road Bridges across river Kosi near Nirmali, Bihar, (about 38 km. Upstream/downstream of kosi Barrage). Various alternatives were analyzed on physical model to arrive at optimum waterway, guide bunds and afflux bunds. Studies were undertaken under existing conditions as well as with proposed bridges for discharges of 22375 m3/s and 26900 m3/s. For waterway of 1.875 km. An afflux of 1.35 m was observed at the bridge site.For a discharge of 22375 m3/s. various trials on the physical model to improve the flow conditions at the bridges and distribute the flow more uniformly through the spans of the bridges by adjusting both guide bund. Construction of Road Bridge has been completed and functioning very well. Construction of Rail Bridge is under progress. The present paper describes the hydraulic aspect of various components of the bridges

Authors

Publication Details

Journal
International Journal of Advanced Research in Science Communication and Technology
Published
2025-04-04
DOI
https://doi.org/10.48175/ijarsct-24878
Primary Topic
Hydrology and Sediment Transport Processes
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hydraulic Bridge

Tanmay Garud, Aditya Tile, Krishna Dushing, Shubham Gaidhani et al.
International Journal of Advanced Research in Science Communication and Technology
Hydrology and Sediment Transport Processes
article

Hydraulic Bridge

Tanmay Garud, Aditya Tile, Krishna Dushing, Shubham Gaidhani, Prof. P. R. Kshatriya
article en

Abstract

Bridge construction requires careful planning and in-depth study as no undue risk should be taken in its design and construction. Constructing a bridge across braided river is still a Challenging task. Hydraulic aspects of bridge design mainly consists of selection of site, optimum orientation and waterway, location of abutments, design of guide banks, approach banks, and design of piers.. Hydraulic model studies were carried out at CW&PRS for the Rail and Road Bridges across river Kosi near Nirmali, Bihar, (about 38 km. Upstream/downstream of kosi Barrage). Various alternatives were analyzed on physical model to arrive at optimum waterway, guide bunds and afflux bunds. Studies were undertaken under existing conditions as well as with proposed bridges for discharges of 22375 m3/s and 26900 m3/s. For waterway of 1.875 km. An afflux of 1.35 m was observed at the bridge site.For a discharge of 22375 m3/s. various trials on the physical model to improve the flow conditions at the bridges and distribute the flow more uniformly through the spans of the bridges by adjusting both guide bund. Construction of Road Bridge has been completed and functioning very well. Construction of Rail Bridge is under progress. The present paper describes the hydraulic aspect of various components of the bridges

International Journal of Advanced Research in Science Communication and Technology
Openalex Percentile: Top 93%
Hydrology and Sediment Transport Processes
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.