Exploring the Trade-Off Between Repair Time and Reliability in Large Scale Cluster Computers: A Simulation-Based Approach

As the size of high performance computing (HPC) computational clusters continues to increase in performance, scale and component count, the role that reliability and particularly the repair time plays a significant role in system specification, procurement, and ultimate operation of such systems. System administrators must find a balance among competing factors: initial capital investment, operational costs and observed system performance and utility from the end users' perspectives are chief among them. In this paper, we explore the tradeoff between reliability, performance and node repair times in large-scale high performance computing (HPC) computational clusters using real historical workloads from Los Alamos National Laboratory (LANL). We enhance an existing cluster simulator to more quickly perform the large-scale parameter sweeps necessary to obtain meaningful results for these studies, in some cases by several orders of magnitude. Our results show that these simulations can be parameterized to identify trends that can be used to make decisions about system procurement and operation as a function of the operational parameters and constraints.

Authors

Institutions

Publication Details

Published
2024-09-23
DOI
https://doi.org/10.1109/hpec62836.2024.10938435
Primary Topic
Advanced Queuing Theory Analysis
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploring the Trade-Off Between Repair Time and Reliability in Large Scale Cluster Computers: A Simulation-Based Approach

Nathan DeBardeleben, William M. Jones, Vivian E. Hafener, Steven T. Senator et al.
1 links
Advanced Queuing Theory Analysis
article

Exploring the Trade-Off Between Repair Time and Reliability in Large Scale Cluster Computers: A Simulation-Based Approach

Nathan DeBardeleben, William M. Jones, Vivian E. Hafener, Steven T. Senator, Craig S. Walker, Leslie A. Horace
article en

Abstract

As the size of high performance computing (HPC) computational clusters continues to increase in performance, scale and component count, the role that reliability and particularly the repair time plays a significant role in system specification, procurement, and ultimate operation of such systems. System administrators must find a balance among competing factors: initial capital investment, operational costs and observed system performance and utility from the end users' perspectives are chief among them. In this paper, we explore the tradeoff between reliability, performance and node repair times in large-scale high performance computing (HPC) computational clusters using real historical workloads from Los Alamos National Laboratory (LANL). We enhance an existing cluster simulator to more quickly perform the large-scale parameter sweeps necessary to obtain meaningful results for these studies, in some cases by several orders of magnitude. Our results show that these simulations can be parameterized to identify trends that can be used to make decisions about system procurement and operation as a function of the operational parameters and constraints.

Georgia Institute of Technology (US), Los Alamos National Laboratory (US), Coastal Carolina University (US), Conway School of Landscape Design (US)
Los Alamos National Laboratory
Openalex Percentile: Top 55%
Advanced Queuing Theory Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Exploring the Trade-Off Between Repair Time and Reliability in Large Scale Cluster Computers: A Simulation-Based Approach — Nathan DeBardeleben, William M. Jones, et al. · (2024) | TGRS Research Map | TGRS