Salt Dissolution Success in the Tank Farms: Paving the Road to Closure of Tanks 9 and 10
Overview of Waste Tanks 9 and 10 • Salt waste tanks, nearly identical dimensions • High priority closure projects –Active leak sites –Reside within water table • Objective: Achieve Preliminary Cease Waste Removal (PCWR)
Authors
- J.R. Stetson
Publication Details
- Published
- 2025-02-23
- DOI
- https://doi.org/10.2172/2545721
- Primary Topic
- Agriculture, Water, and Health
- Type
- article
- Field-Weighted Citation Impact
- 0.00