Assessing twin tunnel-induced ground settlements in alluvial deposits by InSAR data

Tunnel excavation in densely urbanised environments presents significant geotechnical challenges. Reliable design predictions, precise monitoring, and a thorough understanding of these challenges are crucial for ensuring the safety and stability of tunnels and surface structures. This study investigates the analysis of ground deformations caused by twin tunnel excavation using an EPB-TBM in alluvial deposits. The analysis is based on data collected through the European Ground Motion Service (EGMS) InSAR and on-site measurements, incorporating both empirical and analytical methods, and time series decomposition techniques (Principal Component Analysis, PCA; Independent Component Analysis, ICA). A key focus of this research is the development of a novel approach for blind identification of TBM activities along the tunnel alignment, followed by a supervised settlement analysis using a modified Gaussian function. By using a consistent number of measurement points for each analysed tunnel cross section, and considering uncertainty by a Leave One Out Cross Validation, we support asymmetric ground settlement resulting from excavation of a second tunnel. The back analysed mean volume loss was found to be 0.33% (st.dev. 0.18), and parameter k was 0.44 (st.dev. 0.23). PCA/ICA techniques were employed to isolate and quantify various deformation components, such as thermal effects, noise, and actual long-term settlements. This enhances the accuracy of settlement predictions, improves the understanding of the deformation patterns and the back-estimation of soil geotechnical parameters, and demonstrates the potential of InSAR data for monitoring tunnel-induced ground deformation, and for attaining more accurate deformation predictions and better infrastructure planning. Finally, the advantages and limitations associated with the use of InSAR data are discussed.

Authors

Publication Details

Journal
Engineering Geology
Published
2025-04-03
DOI
https://doi.org/10.1016/j.enggeo.2025.108059
Citations
7
Primary Topic
Geophysical Methods and Applications
Type
article
Field-Weighted Citation Impact
8.02
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessing twin tunnel-induced ground settlements in alluvial deposits by InSAR data

Giuseppe Dattola, Alberto Previati, Giovanni B. Crosta, Serena Rigamonti
7 citations
Engineering Geology
Geophysical Methods and Applications
8.02
article

Assessing twin tunnel-induced ground settlements in alluvial deposits by InSAR data

Giuseppe Dattola, Alberto Previati, Giovanni B. Crosta, Serena Rigamonti
article en
7 citations

Abstract

Tunnel excavation in densely urbanised environments presents significant geotechnical challenges. Reliable design predictions, precise monitoring, and a thorough understanding of these challenges are crucial for ensuring the safety and stability of tunnels and surface structures. This study investigates the analysis of ground deformations caused by twin tunnel excavation using an EPB-TBM in alluvial deposits. The analysis is based on data collected through the European Ground Motion Service (EGMS) InSAR and on-site measurements, incorporating both empirical and analytical methods, and time series decomposition techniques (Principal Component Analysis, PCA; Independent Component Analysis, ICA). A key focus of this research is the development of a novel approach for blind identification of TBM activities along the tunnel alignment, followed by a supervised settlement analysis using a modified Gaussian function. By using a consistent number of measurement points for each analysed tunnel cross section, and considering uncertainty by a Leave One Out Cross Validation, we support asymmetric ground settlement resulting from excavation of a second tunnel. The back analysed mean volume loss was found to be 0.33% (st.dev. 0.18), and parameter k was 0.44 (st.dev. 0.23). PCA/ICA techniques were employed to isolate and quantify various deformation components, such as thermal effects, noise, and actual long-term settlements. This enhances the accuracy of settlement predictions, improves the understanding of the deformation patterns and the back-estimation of soil geotechnical parameters, and demonstrates the potential of InSAR data for monitoring tunnel-induced ground deformation, and for attaining more accurate deformation predictions and better infrastructure planning. Finally, the advantages and limitations associated with the use of InSAR data are discussed.

Engineering GeologyVol. 352
Climate action, Sustainable cities and communities
Openalex Percentile: Top 3%
Geophysical Methods and Applications
8.02
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Assessing twin tunnel-induced ground settlements in alluvial deposits by InSAR data — Giuseppe Dattola, Alberto Previati, et al. · Engineering Geology (2025) | TGRS Research Map | TGRS