Regularities of The Deposit Shearing Process in The Cave-In Zone of The Annenskaya Mine of The East Zhezkazgan Mine

The article considers the peculiarities of manifestation of the character of the shear process in the conditions of the collapsed zone of the Annenskaya mine of the East-Zhezkazgan mine. The questions of replenishment of retired capacities are considered, where it is supposed at the expense of working out of reserves from pillars by re-mining from the open excavated space, and also pillars and remaining reserves by field methods of excavation in conditions of mass caving. The mining and geological conditions of the flank parts of the deposit and the areas near the mass cave-ins differ significantly from the central ore field. In this connection, we propose a chamber and pillar system with a change in the technology of reserve mining at the Annensky site and with the re-mining of the remaining reserves in pillars of various purposes. The problem has arisen, the complexity of the solution of which lies in the absence of generally accepted methodological bases of management of accompanying geomechanical processes required for designing of reserves development in the above mentioned specific conditions and ensuring safety of mining operations, which has caused the necessity of carrying out research works in this direction.

Authors

Publication Details

Journal
Trudy Universiteta
Published
2025-03-19
DOI
https://doi.org/10.52209/1609-1825_2025_1_216
Primary Topic
Geotechnical and Geomechanical Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Regularities of The Deposit Shearing Process in The Cave-In Zone of The Annenskaya Mine of The East Zhezkazgan Mine

Raissa Zhanakova, Gulnar Jangulova, Dossanbay Bekbergenov, Olzhas Kurmanbayev
Trudy Universiteta
Geotechnical and Geomechanical Engineering
article

Regularities of The Deposit Shearing Process in The Cave-In Zone of The Annenskaya Mine of The East Zhezkazgan Mine

Raissa Zhanakova, Gulnar Jangulova, Dossanbay Bekbergenov, Olzhas Kurmanbayev
article en

Abstract

The article considers the peculiarities of manifestation of the character of the shear process in the conditions of the collapsed zone of the Annenskaya mine of the East-Zhezkazgan mine. The questions of replenishment of retired capacities are considered, where it is supposed at the expense of working out of reserves from pillars by re-mining from the open excavated space, and also pillars and remaining reserves by field methods of excavation in conditions of mass caving. The mining and geological conditions of the flank parts of the deposit and the areas near the mass cave-ins differ significantly from the central ore field. In this connection, we propose a chamber and pillar system with a change in the technology of reserve mining at the Annensky site and with the re-mining of the remaining reserves in pillars of various purposes. The problem has arisen, the complexity of the solution of which lies in the absence of generally accepted methodological bases of management of accompanying geomechanical processes required for designing of reserves development in the above mentioned specific conditions and ensuring safety of mining operations, which has caused the necessity of carrying out research works in this direction.

Trudy UniversitetaVol. 1(98)
Openalex Percentile: Top 93%
Geotechnical and Geomechanical Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.