Multi-Timescale Nested Hydropower Station Optimization Scheduling Based on the Migrating Particle Whale Optimization Algorithm

Exploring efficient and stable solution methods for hydropower generation optimization models is crucial for enhancing reservoir power generation efficiency and achieving the sustainable use of water resources. However, existing studies predominantly focus on single-timescale scheduling models, failing to fully exploit multi-timescale runoff information. Additionally, commonly used solution algorithms often face challenges such as premature convergence, susceptibility to local optima, and dimensionality issues. To address these limitations, this paper proposes the Migrating Particle Whale Optimization Algorithm (MPWOA), which initializes the population using chaotic mapping, incorporates a particle swarm mechanism to enhance exploitation during the spiral predation phase, and integrates the black-winged kite migration mechanism to improve stochastic search performance. Validation on classical test functions and the Jiangpinghe River of the multi-timescale nested optimal scheduling model demonstrates that MPWOA exhibits faster convergence and stronger optimization capabilities and significantly improves power generation. The multi-timescale nested scheduling scheme derived from this algorithm effectively utilizes runoff information, offering a practical and highly efficient solution for hydropower scheduling.

Authors

Institutions

Publication Details

Journal
Energies
Published
2025-04-02
DOI
https://doi.org/10.3390/en18071780
Primary Topic
Metaheuristic Optimization Algorithms Research
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Timescale Nested Hydropower Station Optimization Scheduling Based on the Migrating Particle Whale Optimization Algorithm

Li Mo, Bei Liu, Mi Zhang, Guosheng Zhou et al.
2 links
Energies
Metaheuristic Optimization Algorithms Research
article

Multi-Timescale Nested Hydropower Station Optimization Scheduling Based on the Migrating Particle Whale Optimization Algorithm

Li Mo, Bei Liu, Mi Zhang, Guosheng Zhou, Daozheng Huang, Hao Yu
article en

Abstract

Exploring efficient and stable solution methods for hydropower generation optimization models is crucial for enhancing reservoir power generation efficiency and achieving the sustainable use of water resources. However, existing studies predominantly focus on single-timescale scheduling models, failing to fully exploit multi-timescale runoff information. Additionally, commonly used solution algorithms often face challenges such as premature convergence, susceptibility to local optima, and dimensionality issues. To address these limitations, this paper proposes the Migrating Particle Whale Optimization Algorithm (MPWOA), which initializes the population using chaotic mapping, incorporates a particle swarm mechanism to enhance exploitation during the spiral predation phase, and integrates the black-winged kite migration mechanism to improve stochastic search performance. Validation on classical test functions and the Jiangpinghe River of the multi-timescale nested optimal scheduling model demonstrates that MPWOA exhibits faster convergence and stronger optimization capabilities and significantly improves power generation. The multi-timescale nested scheduling scheme derived from this algorithm effectively utilizes runoff information, offering a practical and highly efficient solution for hydropower scheduling.

EnergiesVol. 18(7)
Changjiang Institute of Survey, Planning, Design and Research (CN), Hubei Provincial Water Resources and Hydropower Planning Survey and Design Institute (CN), Huazhong University of Science and Technology (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 97%
Metaheuristic Optimization Algorithms Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Multi-Timescale Nested Hydropower Station Optimization Scheduling Based on the Migrating Particle Whale Optimization Algorithm — Li Mo, Bei Liu, et al. · Energies (2025) | TGRS Research Map | TGRS