Increasing Power Production of Small Dam Hydroelectric Plants

The United States Army Corps of Engineers (USACE) built and manages the Summersville dam and its recreation area.The USACE's priorities are flood control downstream of Summersville Lake and recreation, not producing

Authors

Publication Details

Published
2025-04-02
DOI
https://doi.org/10.18260/1-2-1153-53950
Primary Topic
Industrial Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Increasing Power Production of Small Dam Hydroelectric Plants

Jordan Cox, Farshid Zabahian
Industrial Engineering and Technologies
article

Increasing Power Production of Small Dam Hydroelectric Plants

Jordan Cox, Farshid Zabahian
article en

Abstract

The United States Army Corps of Engineers (USACE) built and manages the Summersville dam and its recreation area.The USACE's priorities are flood control downstream of Summersville Lake and recreation, not producing

U.S. Army Corps of Engineers
Affordable and clean energy
Openalex Percentile: Top 94%
Industrial Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Increasing Power Production of Small Dam Hydroelectric Plants — Jordan Cox, Farshid Zabahian · (2025) | TGRS Research Map | TGRS