Identifying the Impact of Preconstruction Elements on Project Budget

Minimizing budget variances is one of the prime objectives during the preconstruction phase. Failing to control budget variances leads to poor project outcomes such as low project quality, deficiencies in design, inaccurate financing, a longer decision-making process, and instabilities in the project timeline. To minimize budget variances and ensure a productive decision-making process, project owners should be familiar with critical elements in a project that cause variances in the budget during the preconstruction phase. In this study, the impact of 10 critical preconstruction elements on budget variances is discussed. These 10 elements are identified to be critical with the criteria of either significantly impacting budget variances during the preconstruction phase or believed to be critical from the previous studies. However, the results showed no significant impact on the budget variances. In most previous studies focusing on the critical elements impacting project budgets, data were collected by surveying construction professionals. In this study, objective data related to project preconstruction budgets and analysis rooted in objective, quantitative data as opposed to self-reported data were used. Using the results of this study, project owners will be able to prioritize the most significant elements and give lower priority to noncritical elements in order to focus on more important decisions as they make decisions related to the project.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2025-04-02
DOI
https://doi.org/10.1061/jcemd4.coeng-15921
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Identifying the Impact of Preconstruction Elements on Project Budget

Matthew Reyes, Sogol Salary
Journal of Construction Engineering and Management
Construction Project Management and Performance
article

Identifying the Impact of Preconstruction Elements on Project Budget

Matthew Reyes, Sogol Salary
article en

Abstract

Minimizing budget variances is one of the prime objectives during the preconstruction phase. Failing to control budget variances leads to poor project outcomes such as low project quality, deficiencies in design, inaccurate financing, a longer decision-making process, and instabilities in the project timeline. To minimize budget variances and ensure a productive decision-making process, project owners should be familiar with critical elements in a project that cause variances in the budget during the preconstruction phase. In this study, the impact of 10 critical preconstruction elements on budget variances is discussed. These 10 elements are identified to be critical with the criteria of either significantly impacting budget variances during the preconstruction phase or believed to be critical from the previous studies. However, the results showed no significant impact on the budget variances. In most previous studies focusing on the critical elements impacting project budgets, data were collected by surveying construction professionals. In this study, objective data related to project preconstruction budgets and analysis rooted in objective, quantitative data as opposed to self-reported data were used. Using the results of this study, project owners will be able to prioritize the most significant elements and give lower priority to noncritical elements in order to focus on more important decisions as they make decisions related to the project.

Journal of Construction Engineering and ManagementVol. 151(6)
University of Oklahoma (US)
Openalex Percentile: Top 93%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.