Distribution Comparisons of EAC Cost Growth for Aircraft Work Breakdown Structure Elements
In this study, the authors analyze probability distributional fits to Estimate at Completion cost growth for various Work Breakdown Structure elements. Results suggest either the lognormal or Weibull as best fits and a possible underestimating of the Coefficients of Variance and 85th percentiles in a program’s budget.
Authors
- Jonathan D. Ritschel (ORCID: https://orcid.org/0000-0002-4816-0113)
- Shawn M. Valentine
- Brandon Lucas
- Edward D. White
- Robert J. Fass
- Kyle Marquiz
Publication Details
- Journal
- Defense Acquisition Research Journal
- Published
- 2025-04-01
- DOI
- https://doi.org/10.22594/dau.24-925.32.01
- Primary Topic
- Manufacturing Process and Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00