Abstract The DONES (Demo Oriented NEutron Source) objective is to irradiate in a simulated fusion irradiation environment a sufficiently large number of specimens with required neutron fluxes for an adequate period of time. To achieve the required results, a target of 70% of operational availability was established for DONES facility design, which means that, the facility is expected to be available for irradiation (i.e. with the beam on at full power) for 255.5 d per year. Such an average operational availability requirement combined with the foreseen scheduled annual maintenance scheme (20 + 3 d) implies an inherent availability requirement of 74.7% (i.e. ∼75 %) for the DONES facility. Allocating this target to individual systems within the whole plant, the following system targets for inherent availability were defined: Accelerator Facility 87 %, Lithium Target Facility 94 %, Test Facility 96 %, Conventional Facilities 98% and Central Control System & Common Instrumentation 98 %. Key elements to ensure the availability objective set for a complex and innovative plant such as DONES are to accompany the engineering development of DONES with reliability and availability (RA) analysis, reliability testing of components and systems and the application of ‘reliability growth’, the structured process of identifying the root causes of reliability problems and predicting and monitoring the increase in system reliability through successive phases. Since RA are closely linked to the maintenance and inspection activities carried out during plant operations, the integrated approach for RA optimization needs to be based on all four issues: Reliability, Availability, Maintainability and Inspectability (RAMI). Accordingly, RAMI analyses cover all stages of DONES progress and specific studies have been performed for the various systems. This paper presents the RAMI studies conducted to date.

Authors

Institutions

Publication Details

Journal
Nuclear Fusion
Published
2025-04-01
DOI
https://doi.org/10.1088/1741-4326/adc7ca
Citations
1
Primary Topic
Nuclear Physics and Applications
Type
article
Field-Weighted Citation Impact
1.88
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

RAMI studies for DONES

Jacek Kałowski, Karol Kowal, S. Potempski, Danilo Nicola Dongiovanni et al.
1 citations
Nuclear Fusion
Nuclear Physics and Applications
1.88
article

RAMI studies for DONES

Jacek Kałowski, Karol Kowal, S. Potempski, Danilo Nicola Dongiovanni, Juanjo Rueda, Tonio Pinna, Diogo Rechena
article en
1 citations

Abstract

Abstract The DONES (Demo Oriented NEutron Source) objective is to irradiate in a simulated fusion irradiation environment a sufficiently large number of specimens with required neutron fluxes for an adequate period of time. To achieve the required results, a target of 70% of operational availability was established for DONES facility design, which means that, the facility is expected to be available for irradiation (i.e. with the beam on at full power) for 255.5 d per year. Such an average operational availability requirement combined with the foreseen scheduled annual maintenance scheme (20 + 3 d) implies an inherent availability requirement of 74.7% (i.e. ∼75 %) for the DONES facility. Allocating this target to individual systems within the whole plant, the following system targets for inherent availability were defined: Accelerator Facility 87 %, Lithium Target Facility 94 %, Test Facility 96 %, Conventional Facilities 98% and Central Control System & Common Instrumentation 98 %. Key elements to ensure the availability objective set for a complex and innovative plant such as DONES are to accompany the engineering development of DONES with reliability and availability (RA) analysis, reliability testing of components and systems and the application of ‘reliability growth’, the structured process of identifying the root causes of reliability problems and predicting and monitoring the increase in system reliability through successive phases. Since RA are closely linked to the maintenance and inspection activities carried out during plant operations, the integrated approach for RA optimization needs to be based on all four issues: Reliability, Availability, Maintainability and Inspectability (RAMI). Accordingly, RAMI analyses cover all stages of DONES progress and specific studies have been performed for the various systems. This paper presents the RAMI studies conducted to date.

Nuclear FusionVol. 65(12)
National Agency for New Technologies, Energy and Sustainable Economic Development (IT), National Centre for Nuclear Research (PL), Instituto Superior de Tecnologias Avançadas (PT)
Openalex Percentile: Top 19%
Nuclear Physics and Applications
1.88
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.