Simulation-Based Probabilistic Risk Assessment (SIMPRA) of Integrated Road-Power Infrastructures Travelled by EVs and ICVs

The integration of road and power infrastructures with hybrid fleets of Electric Vehicles (EVs) and Internal Combustion Vehicles (ICVs) is considered. The Simulation-Based Probabilistic Risk Assessment (SIMPRA) method is used to explore failure scenarios which may arise in the integrated system. SIMPRA is made of the simulator, the scheduler and the planner. The planner models the engineering knowledge of the system by means of an Event Sequence Diagram (ESD); the scheduler aims to adaptively guide the simulation through the ESD finding the failure scenarios, ultimately simulated with the simulator. SIMPRA is applied to a road infrastructure in the New York State, traveled by a blended fleet of EVs and ICVs (with different EVs penetration levels). An IEEE 14 buses power infrastructure is integrated with the road infrastructure for satisfying the energy demand of the EVs. Accidental scenarios of different magnitudes are considered. The results show the capability of SIMPRA of identifying the events that bear the largest vehicle travel times and delays, i.e., the events exposing most to disruptions the road-power infrastructure.

Authors

Institutions

Publication Details

Published
2024-11-20
DOI
https://doi.org/10.1109/icsrs63046.2024.10927479
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulation-Based Probabilistic Risk Assessment (SIMPRA) of Integrated Road-Power Infrastructures Travelled by EVs and ICVs

Tarannom Parhizkar, Enrico Zio, Francesco Di Maio, Vittorio Casucci
Risk and Safety Analysis
article

Simulation-Based Probabilistic Risk Assessment (SIMPRA) of Integrated Road-Power Infrastructures Travelled by EVs and ICVs

Tarannom Parhizkar, Enrico Zio, Francesco Di Maio, Vittorio Casucci
article en

Abstract

The integration of road and power infrastructures with hybrid fleets of Electric Vehicles (EVs) and Internal Combustion Vehicles (ICVs) is considered. The Simulation-Based Probabilistic Risk Assessment (SIMPRA) method is used to explore failure scenarios which may arise in the integrated system. SIMPRA is made of the simulator, the scheduler and the planner. The planner models the engineering knowledge of the system by means of an Event Sequence Diagram (ESD); the scheduler aims to adaptively guide the simulation through the ESD finding the failure scenarios, ultimately simulated with the simulator. SIMPRA is applied to a road infrastructure in the New York State, traveled by a blended fleet of EVs and ICVs (with different EVs penetration levels). An IEEE 14 buses power infrastructure is integrated with the road infrastructure for satisfying the energy demand of the EVs. Accidental scenarios of different magnitudes are considered. The results show the capability of SIMPRA of identifying the events that bear the largest vehicle travel times and delays, i.e., the events exposing most to disruptions the road-power infrastructure.

University of California, Los Angeles (US), Politecnico di Milano (IT)
Industry, innovation and infrastructure
Openalex Percentile: Top 72%
Risk and Safety Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Simulation-Based Probabilistic Risk Assessment (SIMPRA) of Integrated Road-Power Infrastructures Travelled by EVs and ICVs — Tarannom Parhizkar, Enrico Zio, et al. · (2024) | TGRS Research Map | TGRS