Using the critical path method (CPM) for evaluating allocation potential of temporary housing units

Abstract For disaster relief to be effective, responses must be quick and adaptable to the circumstances. The critical path method is a project management technique that assists in maintaining construction project timelines and limiting delays. This study applies the sequential approach of the critical path method to the manufacturing and logistical phases of post-disaster temporary housing to reduce delays that can lead to prolonged sheltering and homelessness. A nodal analysis from the critical path reveals the attributes (manufacturing or logistical), such as door and window cutouts or cabinet installation, that can lead to delays in the actual allocation and occupation of units. The resulting critical path analysis model determines approximately 49 days are required to manufacture and allocate a modular unit design and discusses potential pathways of proactive manufacturing and fast-tracking to maintain current expected sheltering periods of 21 days for displaced populations. These diagrams and discussions can benefit decision-making personnel to determine which tasks in the temporary housing manufacturing process require prioritization to reduce timelines and consequently reduce the potential of prolonged displacement following displacement events.

Authors

Institutions

Publication Details

Journal
Journal of Housing and the Built Environment
Published
2025-03-27
DOI
https://doi.org/10.1007/s10901-025-10196-z
Citations
6
Primary Topic
Urban and Rural Development Challenges
Type
article
Field-Weighted Citation Impact
37.06

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Using the critical path method (CPM) for evaluating allocation potential of temporary housing units

Daniel V. Perrucci, Rachel Brown, M. J. Perry, John R. Wilson et al.
6 citations
Journal of Housing and the Built Environment
Urban and Rural Development Challenges
37.06
article

Using the critical path method (CPM) for evaluating allocation potential of temporary housing units

Daniel V. Perrucci, Rachel Brown, M. J. Perry, John R. Wilson, Jalene Mireles Camey, Charles Doktycz, German C. Buitrago
article en
6 citations

Abstract

Abstract For disaster relief to be effective, responses must be quick and adaptable to the circumstances. The critical path method is a project management technique that assists in maintaining construction project timelines and limiting delays. This study applies the sequential approach of the critical path method to the manufacturing and logistical phases of post-disaster temporary housing to reduce delays that can lead to prolonged sheltering and homelessness. A nodal analysis from the critical path reveals the attributes (manufacturing or logistical), such as door and window cutouts or cabinet installation, that can lead to delays in the actual allocation and occupation of units. The resulting critical path analysis model determines approximately 49 days are required to manufacture and allocate a modular unit design and discusses potential pathways of proactive manufacturing and fast-tracking to maintain current expected sheltering periods of 21 days for displaced populations. These diagrams and discussions can benefit decision-making personnel to determine which tasks in the temporary housing manufacturing process require prioritization to reduce timelines and consequently reduce the potential of prolonged displacement following displacement events.

Journal of Housing and the Built EnvironmentVol. 40(3)
East Carolina University (US), Nashville Oncology Associates (US)
East Carolina University
Openalex Percentile: Top 0%
Urban and Rural Development Challenges
37.06
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.